Similar Projects
Student Housing Project Construction
New Construction
Conception
Breckenridge, CO 80424

New Powerhouse Campus Facility
New Construction - 150,000 SF
Conception
Fort Collins, CO 80524

Acoustic Renovation
Renovation
Design
Boulder, CO

Engineering Building Addition
Addition - 24,000 SF
Design
$16,700,000 est. value
Colorado Springs, CO

RFP Construction Manager - MSU Denver Health Institute (AKA: Interprofessional Simulation and Skills Hub Renovation)
Renovation
Bidding
$900,000 CJ est. value
Denver, CO 80202

RFP D/B - UMC-HVAC Maintenance
Renovation
Bidding
$2,180,000 CJ est. value
Boulder, CO 80302

General Construction Services
Alteration
Post-Bid
CO

Afb-Csbv-Notice #21-57-Ucb000215-Seel-314A-Lab Renovation
Renovation - 6,183 SF
Post-Bid
$750,000 est. value
Boulder, CO

Cu Anschutz Pn20-125493
Renovation
Results
Less than $3,078,000 est. value
Denver, CO

North Quad Renovation
Renovation
Results
Less than $537,856 est. value
Aurora, CO 80011

Learning Commons Remodel
Construction
Leadville, CO 80461

Cira Commons - Building Core and Shell
Construction
Less than $925,000 est. value
Fort Collins, CO 80521

Colorado Mountain College Steamboat Springs Student Housing
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Steamboat Springs, CO 80487

FRCC Blanca Peak Mechanical HVAC Retrofit Project
Renovation
Bidding
$4,364,000 CJ est. value
Fort Collins, CO 80526

UCCS Cybersecurity and Space Ecosystem Expansion
Renovation - 26,877 SF
Post-Bid
Colorado Springs, CO 80907

Last Updated 09/21/2022 02:17 PM
Project Title

Cragmor Hall Fire Suppression

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80923   (El Paso County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,058,476 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Accepting Request for Proposals for the Cragmor Hall Fire Suppression Project Email Questions (Clarifications) Due: July 25, 2022, 5:00PM Email questions to Carolyn Fox at submit@uccs.edu Email responses will be posted here by July 29, 2022 Sealed Proposal (Evaluation and Award: Step II) Due September 9, 2022, 5:00PM Oral Interviews: September 9, 2022 Selection Announced: September 12, 2022 Anticipated Design Start: September 27, 2022 Anticipated Construction Start/Finish: December 15, 2022/ January 15, 2025 Late Submittals will be rejected without consideration. The University of Colorado Colorado Springs (UCCS) and the State of Colorado assume no responsibility for costs related to the preparation of the submittals.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents