Similar Projects
HVAC Renovations at the Mount Arlington Public School
Bidding
$250,000 est. value
Mount Arlington, NJ 07856

OFFICE HVAC Renovations at the Mt Arlington Public School
Alteration
Bidding
$100,000 est. value
Mount Arlington, NJ 07856

Hardwood Synthetic Sports Flooring
Post-Bid

Furnishing Trophies and Plaques
Term Contract
Post-Bid
Randolph, NJ 07869

Rooftop Unit Replacement at the Morris County Library, Part II
Results
Morristown, NJ 07960

HVAC Equipment Repair, Replacement and Maintenance
Results
$239 est. value
Parsippany, NJ 07054

HVAC Upgrades at Dennis B. O`Brien Elementary School
Construction
Less than $3,000,000 est. value
Dover, NJ 07801

24 Hazelwood Avenue and 600 Clinton Avenue Summer 2021 Capital Projects
Infrastructure, Alteration
Construction
$131,000 est. value
Newark, NJ 07106

HVAC Maintenance and Repair Services
Alteration
Bidding
East Hanover, NJ

In-station Air Fill Station and Compressor to Be Installed at the District No. 6
Post-Bid
Parsippany, NJ 07054

Renovation and HVAC Replacement
Results
Budd Lake, NJ 07828

Main Gym Floor Replacement at Parsippany High School
Alteration
Bidding
Parsippany, NJ 07054

Senior Center HVAC Upgrade Project
Post-Bid
Mendham, NJ 07945

HVAC Repair Services Labor Rates
Results
Morristown, NJ 07963

FN1505-20 Furniture Components Installation Services
Post-Bid
Washington, DC

Last Updated 12/23/2021 08:18 AM
Project Title

Butterworth Sewer Treatment Plant Laboratory Furniture and Flooring

Physical Address View project details and contacts
City, State (County) Convent Station, NJ   (Morris County)
Category(s) Single Trades
Sub-Category(s) Flooring, Furnishings, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work proposed is the removal of existing cabinets and fume hood and countertops and the replacement of the flooring in the laboratory. The new cabinets and fume hood will replace the existing cabinets in-kind.

Details

Division 09 - Finishes, Flooring.
Division 22 - Plumbing, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Laboratory Chemical-Waste and Vent Piping.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Ventilation Hoods.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents