Similar Projects
Mountain Bike Trail Construction
Infrastructure
Bidding
Glenwood Springs, CO 81601

2021 Citywide ADA Ramp and Concrete Repair 3
Infrastructure
Bidding
$3,800,000 to $4,200,000 est. value
Denver, CO

Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Asphalt Repair and Replacement at The Estes Park Campground at Mary`s Lake
Post-Bid
Estes Park, CO 80517

Citadel Mall Improvements Project
Results
Colorado Springs, CO

2020 Curb, Gutter and Sidewalk Replacement Project
Results
Castle Rock, CO 80109

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

O'Reilly Auto Parts #2993
Renovation
Construction
$100,000 to $300,000 est. value
Clifton, CO 81520

Travel Centers Of America Addition
New Construction - 5,600 SF
Pending Verification
Commerce City, CO 80022

Concrete Utility Project
Infrastructure
Bidding
Englewood, CO

W-Line Shared Use Path - Oak to Kipling and Zephyr to Wadsworth
Post-Bid
Lakewood, CO 80228

2020 Town Facility Parking Lot Improvement Project
Results
$1,866,286 est. value
Castle Rock, CO 80109

Division Boulevard Sidewalk Improvements
Infrastructure
Bidding
Platteville, CO 80651

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

2020 Sidewalk Repair and Curb Ramp Retrofit Project
Results
Less than $3,010,700 est. value
Castle Rock, CO 80104

Reported 06/19/2021 12:00 AM
Project Title

County Road 120 to Poncha Town Center Trail

Physical Address View project details and contacts
City, State (County) Poncha Springs, CO 81201   (Chaffee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 05/21/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of an ~640LF Trail connecting CR 120 to the north access point of the Poncha Town Center and Legree’s Grocery Store including traversing the hill up to CR 120. The Trail is designed to be 8’ wide with 4” compacted class 6 road base, commercial weed barrier and topped with compacted grey breeze crushed fines.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents