Similar Projects
2020 Construction Season - Fuller Court and Nixon/Traver Blvd Sidewalk Gap Project
Post-Bid
Ann Arbor, MI

Jackson and Washtenaw Sidewalk Gap Elimination Project
Post-Bid
Ann Arbor, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

211 Monroe Parking Lot Resurfacing
Results
Less than $24,134 est. value
Saline, MI

2020 Ramp and Sidewalk Repair Program
Post-Bid
Ann Arbor, MI

0.76 MI of Hot Mix Asphalt Shared use Path with Helical Pile Supported Timber Boardwalk, Concrete Sidewalks, Culverts, and Drainage along Grand Street Mill Creek Trail
Results
Dexter, MI 48130

Michigan Memorial Phoenix Project Laboratory Building Number 1000404 Refurbish Sidewalk Lift and Adjacent Concrete Bidpack 01 - Construction
Post-Bid
Ann Arbor, MI

Woodland Center Correctional Facility Security System Upgrades – Phase II
Results
Whitmore Lake, MI 48189

Sidewalk Replacement and Repair - 2020
Post-Bid
Ypsilanti, MI

Pierce Lake Golf Course Cart Path and Roadway Reconstruction
Results
Chelsea, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

2019 Sidewalk Gap Elimination Project
Results
Ann Arbor, MI

Sidewalk Gap at Ann Arbor-Saline Road
Post-Bid
Ann Arbor, MI

Chelsea School District - Br2 - Football And Admin Lots
Results
Chelsea, MI

Multiple Blocks Building Number 0080001 Michigan Medicine Briarwood Building 1-5 Parking Lot Reconstruction
Post-Bid
Ann Arbor, MI 48108

Reported 09/10/2020 12:00 AM
Project Title

Community Center Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Whitmore Lake, MI 48189   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 08/17/20
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new parking area north of the Community Center. Permeable gravel system, including excavation, grading and materials. New lighting and replace old lighting. Restriping existing area.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents