Similar Projects
Last Updated | 03/15/2023 10:07 AM |
Project Title | Loading Dock Repairs |
Physical Address | View project details and contacts |
City, State (County) | Whitewater, WI 53190 (Walworth County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Permitting, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $96,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. Replacing an existing pedestrian ramp and concrete pavement in front of an existing loading dock. Work includes demolition of existing ramp and adjacent pavement, new pedestrian ramp and concrete pavement, and furnishing a new dock leveler. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. No in-person pre-bid tour will be offered. Bidders are welcome to visit the site to walk the exterior to see conditions during the hours of 8:00 am - 5:00 pm. A site visit by each bidder is highly recommended prior to submitting the bid for this work. The site is open to the public. Contractor shall stop at the Visitor Center located at 826 West Starin Road to obtain a parking pass prior to inspection onsite. Failure to visit the site or failure to examine any and all Contract Documents will in no way relieve the successful contractor from necessity of furnishing any materials or equipment, or performing any work, that may be required to complete the work in accordance with the Contract Documents. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |