Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

1.93 MI of Roadway Widening and Reconstruction and Bridge Rehabilitation
New Construction
Bidding
Southfield, MI

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

Cold Patch-High Performance, Annual Estimated Quantities
Term Contract
Post-Bid
Beverly Hills, MI

2019-20 Pavement Reconstruction and Water Main Repalcement Project
Results
Huntington Woods, MI

Maintenance Modified Hand Patching Program
Results
Beverly Hills, MI

1.22 MI of Hot Mix Asphalt Widening Reconstruction, Concrete Curb, Gutter
Bidding
MI

Cold Patch - Bagged and Palletized, Annual Estimated Quantities
Term Contract
Post-Bid
Milford, MI 48381

2019 Asphalt Paving Program
Results
Birmingham, MI

Flex Seal Program
Bidding
Farmington Hills, MI

Maintenance Concrete Patching Program
Post-Bid
Beverly Hills, MI

1.00 MI of Hot Mix Asphalt Rubbilization and Surfacing, Concrete Driveway, Curb, Gutter, Sidewalk and Ramps, Guardrail, Drainage and Pavement Markings on West Nine Mile Road from Inkster Road to Beech
Results
Southfield, MI 48033

Firefighters Park Pathway Project
Bidding
Troy, MI 48098

2020 Road Program
Post-Bid
Bloomfield Hills, MI

6.15 MI of Preventive Maintenance, Hot Mix Asphalt Micro Cold Milling and Ultra-Thin Overlay, Detail 7 Joint and Crack Repairs and Pavement Markings on M-59 from Woodward Avenue to Crooks Road
Results
Auburn Hills, Pontiac, Rochester Hills, MI 48302

Last Updated 01/16/2020 03:10 AM
Project Title

Colony Heights Road Construction

Physical Address View project details and contacts
City, State (County) MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A Contract For 4? HMASurface With Cold Milling HMA Full Depth Removal Over Existing Aggregate Base With Spot Curb and Gutter Removal/Replacement, Sodded Shoulders And Minor Drainage Improvements on 6,712 Lineal Feet or 1.3 Miles of Colony Heights Blvd, Lisa Court, Lisa Circle, Sharon Drive, Melinda Circle, Sherry Street And Melinda Circle East, Located South Of Elizabeth Lake Road and West of Williams Lake Road in White Lake Township

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents