Similar Projects
Burritt Library Addition
Renovation, Addition
Design
$16,000,000 est. value
New Britain, CT 06050

New Stem Research Center
Post-Bid
$198,000,000 est. value
Storrs, CT 06269

UCONN 2000 Code Remediation and Programmatic Renovations Stamford Campus
Renovation - 250,000 SF
Post-Bid
$25,000,000 est. value
Stamford, CT 06269

Public Safety Building Improvements
Addition - 3,500 SF
Results
Storrs, CT 06268

Hicks and Grange Student Room Renovations
Renovation
Results
$1,000,000 est. value
Storrs, CT 06269

Convocation Center
New Construction - 85,000 SF
Construction
$45,000,000 est. value
Fairfield, CT 06824

Academic and Classroom Building
New Construction - 46,073 SF
Construction
$18,968,000 est. value
New Haven, CT 06520

North Campus Townhouse Units Renovations - 2020
Renovation
Post-Bid
New Haven, CT 06515

North Campus Residence Hall Renovations Phase II
Renovation
Results
Storrs, CT 06269

Workforce Training Center
Renovation - 200,000 SF
Construction
Norwalk, CT 06855

Torrey Life Science MCB Lab Renovations
Renovation
Post-Bid
Storrs, CT 06269

North Dining Dish Room Renovation
Renovation
Results
Storrs, CT 06269

Convert to Zebrafish Facility
Renovation - 570 SF
Construction
Farmington, CT

On-Call General Contractor Services Set-Aside Program for Projects Estimated at Under $100,000
Post-Bid
Storrs, CT 06269

Trade Labor Contractor for Academic Renovations
Renovation
Results
Storrs, CT

Reported 08/06/2021 12:00 AM
Project Title

Phase 1 of an Anticipated Multi-Phase Renovation of the Tunxis Community College's Advanced Manufacturing Center at 21 Spring Lane Facility

Physical Address View project details and contacts
City, State (County) Farmington, CT 06032   (Hartford County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this contract includes, but is not limited to the following: The Construction Work is divided into Base Bid and 3 Supplemental Bids. This project is Phase 1 of an anticipated multi-phase renovation of the 21 Spring Lane Facility. The Construction Work includes only limited site improvements and interior renovations to approximately 15,000 SF of the building, with limited interior and infrastructure improvements. The site work includes new ADA-compliant walks at the perimeter of the existing building and connecting the northwest of the existing parking lot to the main campus of Tunxis Community College, limited parking lot and stormwater improvements, and underground conduit, lighting and cameras, to both connect the 21 Spring Lane Facility to the main campus, and service the new walks. Interior improvements to renovate the 21 Spring Lane Facility into Tunxis Community College's Adv. Mfg. Center includes selective demolition, limited masonry.

Details

College/University, Renovation, College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents