Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Tahoe Valley Stormwater and Greenbelt Improvement Project, Phase 1
Infrastructure
Bidding
$7,250,000 to $7,500,000 est. value
South Lake Tahoe, CA

Construction Manager - 2022 Annual Paving Project and Moraga Way Pedestrian Pathway
Infrastructure
Bidding
$3,000,000 est. value
Orinda, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Lincoln Avenue Cold Pavement Recycling
Infrastructure
Results
$11,875,000 to $12,125,000 est. value
Clovis, CA 93630

2022 Countywide Surface Treatment
Infrastructure
Bidding
$6,272,000 est. value
Martinez, CA

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Cold Plane AC Pavement and Overlay with RHMA-G
Infrastructure
Bidding
$1,760,000 est. value
Alameda, CA 94501

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Post-Bid
Fresno, Sequoia National Park, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

Last Updated 05/27/2022 02:54 AM
Project Title

Calistoga Area Phase I Paving

Physical Address View project details and contacts
City, State (County) Napa, CA   (Napa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work in general consists of roadway rehabilitation and methods include but are not limited to overlay, dig out and repairing failed asphalt, striping and signage on Petrified Forest Road, Franz Valley School Road, Myrtledale Road, and Shaw William Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents