Similar Projects
HMA Milling and Resurfacing, Shoulder Work, ADA Ramps, Pavement Marking, and Raised Reflective Markers
Infrastructure
Bidding
IL

Intersection of IL 49 and IL 24 (l.m. 0.00) and Ending at the Vermilion County Line (L.M. 21.50)
Infrastructure
Bidding
IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Furn to Stockpile 5,312 Ft Pipe Culv CL C TY 1 (15"-78" EQRS) 97 Each Band CL C TY 1 (15"24") 5 Each End Section CL C TY 1 (36"-54" EQRS)
Post-Bid
Watseka, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

6 Miles of Milling, Resurfacing, and ADA Improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 Foot Saftey Shoulders will be Added to the Rural Section Between Buckley and Loda.
Results
IL

7.71 Miles, Milling and Resurfacing (Designed Overlay) and ADA Work Begins 0.15 Miles South of South St in Donovan and Ends at US 24 in Sheldon
Infrastructure
Bidding
IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd
Results

Route 317 (US 24) Beginning at the Intersection of US 45/24(L.M. 0.00) in Gilman and Ending at the Intersection of US 24 and IL 1 (L.M. 12.34)
Infrastructure
Bidding
IL

Roadway Widening
Infrastructure
Post-Bid
Sheldon, IL

District 3, Buckley Maintenance Facility
Results
IL

Route 57 (I-57) Beginning at the Ford County Line and Ending Approximately 4.5 Miles North of US 24 (Gilman)
Infrastructure
Bidding
IL

Road Repair
Infrastructure
Post-Bid
Watseka, IL

Overlaying a 21` Wide Roadway, Including HMA Surface Course and All Other Work
Results
Clifton, IL

Last Updated 04/28/2022 12:28 AM
Project Title

Proposed Drainage and Pavement Improvements

Physical Address View project details and contacts
City, State (County) Milford, IL   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed Drainage and Pavement Improvements Along North Walnut Street. Pavement Removal; Earch Excavation; New Storm Sewer; Aggregate Base Course; Hot-Mix Asphalt Pavement; And Other Necessary Appurtenances.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents