Similar Projects
Annual Inspection and Service on Bryan Boilers and Hot Water Boilers
Term Contract
Bidding
Goldsboro, NC 27530

Boiler Replacement at the NC Museum of Art
Alteration
Bidding
$250,000 est. value
Raleigh, NC 27607

ECSU - Mechanical System Upgrades
Post-Bid
Less than $700,000 est. value
Elizabeth City, NC 27909

Sumner Elementary Chiller Replacement Project
Post-Bid
Greensboro, NC 27406

Union West Library Boiler Replacement
Results
Indian Trail, NC 28079

Steam Repairs Phase VIIIC
Results
$1,200,000 to $1,500,000 est. value
Raleigh, NC 27695

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Replacement Of A Boiler At East Iredell Middle School
Post-Bid
Statesville, NC 28625

Boiler Retubing
Results
Butner, NC 27509

Removal and Replacement of Two (2) Hot Water Heaters
Post-Bid
Wilmington, NC

Valley Springs Middle School Mechanical Upgrade
Results
Arden, NC 28704

Steam and Boiler Water Treatment Services
Post-Bid
Kinston, NC 28504

Johnston CI Boiler and Water Heater Replacement
Results
$420,400 est. value
Raleigh, NC

Laars Magnatherm FT Condensing Boiler
Term Contract
Post-Bid
Raleigh, NC

Building 2 Hydronic Piping Replacement at Vanstory Elementary School
Results
Fayetteville, NC 28303

Reported 06/24/2022 12:00 AM
Project Title

Domestic Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27401   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Providing services for the Domestic Water Heater Replacement at the Guilford County Detention Center on the Guilford County owned site located at 201 South Edgeworth Street, Greensboro, NC 27401. The contractor is to provide all required labor, tools, material and equipment for the construction of the domestic water heaters. Work includes but it not limited to: The demolition of all gas-fired water heaters, vent fans and vending, expansion tank, thermostatic mixing valves, associates’ piping, and supply fan, as well as the removal of existing stored water heaters; the installation of new gas-fired water heaters, vent piping, storage tanks, expansion tank, and electronic missing valves; integration of the new water heaters and electronic mixing valves with the existing Building automation system. Electrical work for this project will include power wiring or the new plumbing equipment and the new DDC control system. The Guilford County Detention Center will remain occupied during the course of construction.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents