Similar Projects
Leith Creek Flood Damage Reduction Project
Term Contract
Design
$500,000 to $1,000,000 est. value
Laurinburg, NC

First Avenue Roadway and Drainage Improvements
Bidding
Indian Trail, NC 28079

Grading, Paving, Drainage and Signals at the I-40/I-85/South Elm-Eugen Street Interchange
Infrastructure
Bidding
NC

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Pathways Elementary School Exterior Drainage
Post-Bid
Hillsborough, NC 27278

Historic Stewart Creek Stream Enhancement Phase II
Results
Charlotte, NC 28202

West Vance Street - Drainage Improvements
Results
Less than $53,900 est. value
Zebulon, NC 27597

Aluminum Box Culvert and Headwalls
Infrastructure
Bidding
Clinton, NC 28328

Concrete Pipe
Post-Bid
Winston-Salem, NC 27102

South Mccoy Road Culvert and Stormwater Improvements
Results
Salisbury, NC 28114

HDPE Pipe
Infrastructure
Bidding
Goldsboro, NC 27530

CAPE Emerald Subdivision Pond Outlet Structure and Pipe Relocation
Post-Bid
Emerald Isle, NC 28594

Aluminum Box Culvert with Headwalls
Results
Fayetteville, NC 28301

Reinforced Concrete Pipe
Infrastructure
Bidding
Goldsboro, NC 27530

Deep River Pond Maintenance
Term Contract
Post-Bid
High Point, NC 27265

Reported 03/05/2022 12:00 AM
Project Title

Springside Drive Stream Restoration and Drainage Improvements ARPA Project

Physical Address View project details and contacts
City, State (County) Clemmons, NC 27012   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the pond outlet under Springside Drive with a box culvert. Work will include the installation of a 6’ x 6’ precast reinforced concrete box culvert, upstream and downstream concrete headwalls and wingwalls, an upstream gabion wall and filter stone structure for controlling migration of sediment, and a boulder structure and riffle in the downstream channel.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents