Similar Projects
Design Build Services for Macon Bibb Fire Training Complex
New Construction
Design
$2,800,000 est. value
Macon, GA 31201

City of Metter Fire and Rescue Station
New Construction
Design
Metter, GA

New Gillem Public Safety Building
New Construction - 13,700 SF
Bidding
$5,000,000 est. value
Ellenwood, Forest Park, GA 30294

New Hinesville Fire Station
New Construction
Bidding
Hinesville, GA 31313

Inspections, Maintenance, Service, Repair and Reports for the Fire Training Tower at Fort Gordon, GA.
Post-Bid
Fort Gordon, GA

Fire Station Design - Build
New Construction
Post-Bid
Hartwell, GA 30643

Aircraft Rescue Firefighting Facility Renovation
Renovation - 6,403 SF
Results
$2,486,000 est. value
Atlanta, GA 30336

Paulding County Fire Station 12
New Construction - 4,059 SF
Results
Less than $1,539,707 est. value
Dallas, GA 30132

Construction of New Fire Station 2
New Construction
Construction
$2,997,577 est. value
Augusta, GA

Construction of New Fire Station 20
New Construction
Construction
Hephzibah, GA 30815

New Fire Station 1
New Construction
Design
$6,425,000 est. value
Hinesville, GA 31313

Fire Training Center Addition
Addition
Bidding
Hamilton, GA 31811

City Of Pooler Fire Station #5
New Construction - 5,600 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Pooler, GA 31407

Construction of Fire Station No.13
Results
Lawrenceville, GA 30042

Design-Build Fire Station No. 8 - Gum Creek Road
New Construction
Construction
Less than $1,600,000 est. value
Covington, GA 30014

Reported 12/31/2021 12:00 AM
Project Title

Construction of Fire Station No. 7

Physical Address View project details and contacts
City, State (County) Decatur, GA 30030   (DeKalb County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Commenced March 2021, Construction Completion Expected July 2022
Bids Due View project details and contacts
Estimated Value $5,068,409
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

LSBE Participation: 20% The new Fire Station No. 7, as designed, will include a three (3) bay drive-thru, 15,000 square foot, two (2) story building with a community and exercise room. The station will include all the modern-day amenities to accommodate both male and female firefighters as well as provide unisex facilities. The station is taking into consideration the importance of hot and cold zones to include separate clean out gear and laundry areas on the opposite side from the living space. This new design will hopefully reduce cancer risks associated with modern day firefighting activities by reducing risks associated with cross contamination of carcinogens with sleeping and dining areas. The construction has a parking lot, grading work, a retention pond, sidewalks, parking lot lighting, landscaping and other site work as shown on the construction plans prepared by Brown Design Group. The Contractor shall also provide construction notification signage about the project.

Details

Fire/Police Station, 2 Stories Above Grade, 1,500 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents