Similar Projects
Amphitheater - City of Fremont
New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Fremont, OH 43420

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

2021 Bridge Paving
Infrastructure
Post-Bid
OH

Snowplowing and Lawn Care Work
Infrastructure, Alteration
Post-Bid
Helena, OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

Intersection - SUM-Wooster Road Robinson
Infrastructure
Results
$1,248,937 est. value

2023 Roadway Improvements
Infrastructure
Bidding
$567,500 CJ est. value
Fremont, OH 43420

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Repairs and Resurfacing Eastbound And Westbound Roadways
Infrastructure
Results
$13,500,000 est. value

Jackson Street Water and Sewer Repair
Infrastructure
Bidding
$128,326 CJ est. value
Fremont, OH 43420

Ag-Pro / Gibsonburg
Build-out, Renovation, Infrastructure - 7,000 SF
Post-Bid
$500,000 CJ est. value
Gibsonburg, OH 43431

2022 County Road 128 & County Road 130 Improvements
Infrastructure
Results
$1,100,000 est. value
OH

Superstructure Replacement
Demolition, New Construction, Infrastructure
Bidding
$219,990 CJ est. value
Fremont, OH 43420

SR 510-01.17 - Culvert Replacement Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Vickery, OH 43464

Last Updated 02/28/2023 03:37 AM
Project Title

Spot Patching / Pavement Repair

Physical Address View project details and contacts
City, State (County) Fremont, OH 43420   (Sandusky County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $393,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

OHDOT - Spot Patching / Pavement Repair EDGE Goal: 5.0% Resurface and/or Widen Main Road, Parking Lots and Various Locations Throughout Site. Construct a New Drive Entrance Along Buckland Ave and Convert Old Entrance Into a Walkway for Pedestrians.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents