Similar Projects
3rd Avenue North 9th to 11th Street Reconstruction - City of Great Falls
Infrastructure
Conception
$500,000 CJ est. value
Great Falls, MT 59404

52nd Street North 7th to 10th Avenue North Reconstruction - City of Great Falls
Infrastructure
Conception
$600,000 CJ est. value
Great Falls, MT 59405

Elks Riverside Park Force Main Replacement
Infrastructure
Post-Bid
$300,000 est. value
Great Falls, MT 59401

RFQ Contractor - Construct Fire Station Bay Storage Area at Malmstrom Air Force Base (MAFB)
New Construction, Infrastructure - 20,000 SF
Post-Bid
$10,000,000 CJ est. value
Malmstrom AFB, MT 59402

Gore Hill Water System Improvements
Infrastructure
Results
$2,238,375 CJ est. value
Great Falls, MT 59401

Repair Vehicle Ground Points at Launch Facilities
Infrastructure
Results
$500,000 est. value
MT

Rivers Edge Trail Connector Project - Montana Department of Transportation
New Construction, Infrastructure
Pending Verification
$2,800,000 CJ est. value
Great Falls, MT 59405

3rd Street NorthEast and Westgate (Phase 2) - City of Great Falls
Infrastructure
Conception
$700,000 CJ est. value
Great Falls, MT 59404

Missouri River North Bank Stabilization Phase I
Infrastructure
Post-Bid
$600,000 CJ est. value
Great Falls, MT 59401

Southwest Side Water Main Replacement Phase III
Infrastructure
Results
$1,400,000 est. value
Great Falls, MT

Filter Main Replacement Phase 2 - City of Great Falls
Infrastructure
Conception
$4,500,000 CJ est. value
Great Falls, MT 59401

Simms Wastewater Treatment System Improvements - Phase II
Infrastructure, Renovation
Post-Bid
$330,000 CJ est. value
Simms, MT 59477

Armington Junction - East
Infrastructure
Results
$2,140,120 CJ est. value
Belt, MT 59412

Filter Main Replacement Phase 3 - City of Great Falls
Infrastructure
Conception
$1,500,000 CJ est. value
Great Falls, MT 59401

Sun River Ditch Sun River Avulsion Area Repairs
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Shaw, MT 59443

Last Updated 11/09/2022 12:07 PM
Project Title

Central Avenue / 3rd Street Drainage Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Great Falls, MT 59401   (Cascade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,483,052 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing: Removal of existing surfacing, storm drain piping and manholes; 284 lineal feet of 12" PVC storm drain; 877 lineal feet of 18" PVC storm drain; 411 lineal feet of 18" DR25 C900 PVC storm drain; 504 lineal feet of 54" RCP storm drain; 8 concrete manholes; Three Type 1 curb inlets, and a Hydrodynamic Stormwater separator. CONTRACTOR, and any of the CONTRACTOR'S subcontractors doing work on this project, will be required to obtain registration with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444- 7734. CONTRACTOR is not required to have registered with the DLI prior to bidding on this project, but CONTRACTOR and subcontractors must have registered prior to execution of the Construction Agreement. All laborers and mechanics employed by the CONTRACTOR, or subcontractors in performance of the construction work, shall be paid wages at rates as may be required by the laws of the City of Great Falls and the State of Montana. The CONTRACTOR must ensure that employees, and applicants for employment, are not discriminated against because of their race, color, religion, sex or national origin. Each bid, or proposal, must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to City of Great Falls, in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS, shall furnish an approved Performance Bond and Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Contractor, and all subcontractors, must be licensed to perform work in the City of Great Falls prior to contract award. No bid may be withdrawn after the scheduled time for public opening of bids, which is 3:00 p.m., local time on September 21, 2022. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid, which is in the best interest of the City.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents