Similar Projects
Big Papllion Sewer Siphon Replacement - SEWR-23-001 - City of La Vista
Infrastructure
Conception
$450,000 CJ est. value
La Vista, NE 68128

Big Papllion Sewer Siphon Replacement - SEWR-23-001 - City of La Vista
Infrastructure
Conception
$450,000 CJ est. value
La Vista, NE 68128

New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

The Bridge Flats
New Construction, Infrastructure - 18,000 SF
Design
$13,000,000 CJ est. value
Bellevue, NE 68005

RFP - Sewer Rate Study
Term Contract
Bidding
La Vista, NE 68128

Gretna Middle School #3 - Bid Package 2
New Construction, Infrastructure
Bidding
$65,000,000 CJ est. value
Richland Viii, NE 68028

RFQ D/B - NKO Campus, NKO Facility and Courier Station
New Construction, Infrastructure - 430,000 SF
Post-Bid
$500,000,000 CJ est. value
Offutt AFB, NE 68113

RFQ D/B - NKO Campus, NKO Facility and Courier Station
New Construction, Infrastructure - 430,000 SF
Post-Bid
$500,000,000 CJ est. value
Offutt AFB, NE 68113

Aspen Creek North - Phase 2 Water Main Improvements
Infrastructure
Results
Gretna, NE

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Crisis Stabilization Center - Sarpy County
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Bellevue, NE 68005

Hell Creek Rehab - Olive Street - STRT24003 - City of La Vista
Infrastructure
Conception
$250,000 CJ est. value
La Vista, NE 68128

Cardinal Commons I
New Construction, Infrastructure
Design
$13,000,000 CJ est. value
Highland II, NE 68147

Last Updated 01/17/2023 10:32 PM
Project Title

Oak Leaf Sanitary Sewer Phase I for Sanitary and Improvement District 362

Physical Address View project details and contacts
City, State (County) Springfield, NE 68059   (Sarpy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,263,427 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals will be received by the Clerk of said District at the office of FOLEYSHALD ENGINEERING, LLC for furnishing all labor, tools, materials and equipment required for the project designated as OAK LEAF SANITARY SEWER PHASE I for Sanitary and Improvement District 362, Sarpy County, Nebraska, as per the plans and specifications for said work, at the locations shown on the detailed drawings and in the specifications now on file at the office of FOLEYSHALD ENGINEERING, LLC, at which time proposals received will be publicly opened, read aloud and tabulated. The work consists essentially of the following estimated quantities: APPROXIMATE QUANTITIES ITEM DESCRIPTION QUANTITY UNIT 1 CLEARING AND GRUBBING 1 LS 2 INSTALL SILT FENCE 500 LF 3 MAINTAIN SILT FENCE 500 LF 4 REMOVE SILT FENCE 500 LF 5 MAINTAIN CONSTRUCTION ENTRANCE (3" CRUSHED ROCK AGGREGATE) 200 TN 6 EXCAVATION FOR EXTRA DEEP SANITARY SEWER > 16' DEEP 1,650 LF 7 STABILIZE TRENCH (3" CRUSHED ROCK AGGREGATE) 200 TN 8 CONSTRUCT 6" PVC SANITARY SEWER PIPE W/ TYPE F3 AGGREGATE BEDDING 11,245 LF 9 CONSTRUCT 8" PVC SANITARY SEWER PIPE W/ TYPE F3 AGGREGATE BEDDING 16,330 LF 10 CONSTRUCT 10" PVC SANITARY SEWER PIPE W/ TYPE F3 AGGREGATE BEDDING 3,615 LF 11 CONSTRUCT 12" PVC SANITARY SEWER PIPE W/ TYPE F3 AGGREGATE BEDDING 2,045 LF 12 CONSTRUCT 15" PVC SANITARY SEWER PIPE W/ TYPE F3 AGGREGATE BEDDING 2,685 LF 13 CONSTRUCT 6"X8" WYE 293 EA 14 CONSTRUCT 6"X10" WYE 31 EA 15 CONSTRUCT 6"X12" WYE 9 EA 16 CONSTRUCT 6"X15" WYE 23 EA 17 CONSTRUCT 6" SANITARY SEWER MANHOLE STUBOUT 53 EA 18 CONSTRUCT 15" SANITARY SEWER MANHOLE TAP 1 EA 19 CONSTRUCT 8" SANITARY SEWER PIPE PLUG 10 EA 20 CONSTRUCT 54" I.D. SANITARY MANHOLE (105 EA) 1,442 VF 21 CONSTRUCT RING COLLAR ON SANITARY SEWER MANHOLE 15 EA 22 INSTALL EXTERNAL FRAME SEAL ON SANITARY SEWER MANHOLE 15 EA 23 CONSTRUCT 6" SANITARY SEWER SERVICE RISER (17 EA) 97 VF 24 CONSTRUCT 6" DIAMETER DROP CONNECTION (1 EA) 4 VF 25 CONSTRUCT 8" DIAMETER DROP CONNECTION (1 EA) 4 VF The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) is $3,618,400.00. All proposals must be submitted on bid forms furnished by FOLEYSHALD ENGINEERING, and must be accompanied by a bid bond or a certified check in the amount not less than $180,920.00 made payable to the Treasurer of Sanitary and Improvement District 362 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed, and addressed to the "Clerk of Sanitary and Improvement District 362" and shall be marked "PROPOSAL FOR OAK LEAF SANITARY SEWER PHASE I" with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. The proposed contract shall be executed in compliance therewith. Sanitary and Improvement District 362 of Sarpy County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Questions shall be submitted to engineer of record via email. bshald@foleyshald.com jfoley@foleyshald.com jsiel@foleyshald.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents