Similar Projects
Townhome Development
New Construction
Conception
Edgewater, FL 32120

Sarinna Lakes
New Construction
Conception
New Smyrna Beach, FL 32168

Granada Pointe Master Plan
New Construction
Design
Ormond Beach, FL 32174

Firetower Road Commercial Development
New Construction
Design
Daytona Beach, FL 32124

Williamson Crossing - Building A
New Construction - 7,600 SF
Post-Bid
Daytona Beach, FL 32117

JCPenney #0620
Renovation - 129,101 SF
Post-Bid
Daytona Beach, FL 32114

Developer Partner
Results
Daytona Beach, FL

Hurricane Matthew Housing Rehabilitation Program
Renovation
Results
FL

DiMucci Tower 14
New Construction
Construction
$12,400,000 est. value
Daytona Beach Shores, FL 32118

Woodhaven - Phase I
New Construction
Construction
Port Orange, FL 32127

Daytona Beach Master-Planned Community
New Construction
Pending Verification
Daytona Beach, FL

Amelia Point Villas Mixed-Use Complex
New Construction - 5,500 SF
Pending Verification
De Land, FL 32724

KBC Commerce Park
New Construction - 111,000 SF
Conception
DeBary, FL 32713

Cadence at Parc Hill
New Construction - 398,675 SF
Design
Orange City, FL 32725

Target #1795 - Grocery PickUp
Renovation - 220 SF
Post-Bid
Port Orange, FL 32127

Reported 01/16/2019 01:24 PM
Project Title

Woodhaven - Master Plan

Physical Address View project details and contacts
City, State (County) Port Orange, FL 32129   (Volusia County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Retail, Single-Family Homes
Contracting Method
Project Status Construction Commenced fourth quarter 2018
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Phased Development. Mixed Use. Single family homes, apartment/townhomes, 5 mile walking trail, public park, village-like shopping center (pharmacy, retail, supermarket)
Details Retail, New Construction, 730 Acres, Single-Family Homes, New Construction, 1300 Lots, Apartments/Condominiums, New Construction, 400 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents