Similar Projects
Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $1,914,900 est. value

Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $2,395,000 est. value

Furnish and Place Granite Curbing
Post-Bid
Acton, MA

DPW Contracts
Term Contract
Post-Bid
Hopkinton, MA

Maynard_Sidewalk
Results
$25,000 to $100,000 est. value
Maynard, MA 01754

Hopkinton High School Bus Parking Lot
Results
$600,000 est. value
Hopkinton, MA

Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $1,914,469 est. value

Weston Legacy Trail Construction Project
Post-Bid
Weston, MA

Center and Harrington Schools Parking Lot Expansion
Results
$300,000 est. value
Chelmsford, MA

Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $1,914,917 est. value

Sidewalk & Accessible Ramp Improvements
Post-Bid
$100,000 est. value
Maynard, MA

Construction of a Shared Use Path (Cochituate Rail Trail) Including Signals and Br. Nos. N-03-014 & F-07-033=N-03-029 Over Routes 9 and 30 (Worcester Street and Commonwealth Roads)
Results
Less than $10,005,729 est. value
Framingham, Natick, MA

First Parish Meeting House Site Improvements
Bidding
Less than $300,000 est. value
Tyngsboro, Tyngsborough, MA 01879

Install New Granite Curbing and Remove and Reset Existing Curbing
Post-Bid
Less than $335,437 est. value
Belmont, MA

Dudley Woods Trails Construction
Results
Wayland, MA

Reported 04/02/2019 12:00 AM
Project Title

Installation of Equipment, Management, Operation,Maintenance and Security of the Lower Broadway Community Parking Surface Lot

Physical Address View project details and contacts
City, State (County) Everett, MA 02149   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Parking installation and management firms for the installation of equipment, management, operation, maintenance and security of the Lower Broadway Community Parking Surface Lot located in close proximity to the Encore Boston Casino. In addition to installation of certain parking equipment, the selected firm will provide the City with professional management services and daily operations with a focus on superior customer service, safety, revenue generation and cost control.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents