Similar Projects
Fy22 - Lake Marion Providence Reach-Water Line
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Charleston, SC

Church Street Waterline Replacement
Infrastructure
Bidding
$14,000,000 est. value
Central, SC 29630

Lancaster County Storm Drain Camera Service Contract
Infrastructure, Alteration
Bidding
Lancaster, SC

Sanitary Sewer Manhole and Piping Rehabilitation
Post-Bid
Lexington, SC

Coward Water Imporvements-2019
Post-Bid
Coward, SC

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Hydroponic Lab Foundation and Plaza
Renovation, Infrastructure, Alteration
Bidding
$75,000 to $90,000 est. value
Hartsville, SC 29550

Sewer and Water Lines Project
Post-Bid
Florence, SC 29063

Terrace View and Cofield Sewer Replacement
Results
West Columbia, SC 29169

Access Road - Phase 2
Infrastructure
Bidding
$600,000 est. value
Ridgeville, SC

Advanced Metering Infrastructure System
Post-Bid
West Columbia, SC

Greeleyville Sewer Improvements Project
Results
Greeleyville, SC 29056

Allen Street Pump Station, Farm Street and South Main Street Sewer Upgrades
Renovation, Infrastructure
Bidding
$750,000 est. value
Darlington, SC 29532

Old Orangeburg Gravity Sewer Upgrade
Post-Bid
Lexington, SC

Reported 05/20/2022 12:00 AM
Project Title

Water and Sewer System Improvements

Physical Address View project details and contacts
City, State (County) Hemingway, SC   (Williamsburg County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 2: pipe bursting approx. 7,500 LF of ex. 8" gravity sewer with 8" HDPE, rehabilitation of 31 ex. manholes, and the installation of 8 new manholes. Contract 3: replacing approx. 2,500 LF of ex. 8" gravity sewer with 8" PVC using the open cut method, rehabilitation of 8 ex. manholes, and the installation of 6 new manholes. Contract 4: installing approx. 40 valves and 22 fire hydrants on ex. water lines. See Project Details Link for bid times on each contract.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents