Similar Projects
Amana Academy - West Campus
Renovation - 30,162 SF
Conception
Atlanta, GA 30318

KIPP Soul School
Renovation - 24,100 SF
Design
Less than $1,000,000 est. value
Atlanta, GA 30331

Construction of New K-8 School
New Construction - 50,000 SF
Design
College Park, GA

Freezer / Cooler Mechanical Equipment Replacement at Love T. Nolan Elementary School
Renovation
Sub-Bidding
$200,000 CJ est. value
Atlanta, GA 30349

Freezer / Cooler Mechanical Equipment Replacement at Mountain Park Elementary School
Renovation
Sub-Bidding
$200,000 CJ est. value
Roswell, GA 30075

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

Preventive and Predictive Maintenance Services for Chillers
Term Contract, Alteration
Post-Bid
GA

Petit Science Center Boiler 2 Burner Retrofit
Results
Atlanta, GA 30303

Sweet Apple Elementary School Renovation
Renovation
Results
Less than $2,666,440 est. value
Roswell, GA 30075

Morningside Elementary School Additions and Renovation
Renovation, Addition - 98,037 SF
Construction
Less than $16,300,000 est. value
Atlanta, GA 30306

Main Street Academy Basement Renovations and Improvements
Construction
College Park, GA 30337

Boiler and Water Heater Maintenance
Term Contract
Post-Bid
Atlanta, Forest Park, GA 30310

North Learning Center - Mechanical and Roof Improvements
Results
Atlanta, GA 30350

Atlanta Virtual Academy
Renovation
Post-Bid
Atlanta, GA 30318

Replace Central Plant Boilers
Results
$746,000 est. value
Atlanta, GA 30310

Last Updated 07/25/2022 10:14 AM
Project Title

Freezer / Cooler Mechanical Equipment Replacement at Campbell Elementary School

Physical Address View project details and contacts
City, State (County) Fairburn, GA 30213   (Fulton County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Mechanical
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Fulton County Schools (FCS) invites bids for furnishing any and all goods and/or services required for Freezer/Cooler Mechanical Equipment Replacement at Campbell Elementary School. Questions regarding the bidding process should be directed in writing to the Executive Director of Contracting via facsimile at (470) 254-1248. Only questions received prior to 4:00 p.m. on Tuesday, August 16, 2022 will be considered. Fulton County Schools (FCS) invites bids for furnishing any and all goods and/or services required for Freezer/Cooler Mechanical Equipment Replacement at Mary M. Bethune Elementary School. FCS reserves the right to reject any or all bids and to waive technicalities and informalities. The judgment of FCS on such matters shall be final.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents