Similar Projects
Reported | 05/29/2021 12:00 AM |
Project Title | Fox Hill Subdivision Roadway Improvements |
Physical Address | View project details and contacts |
City, State (County) | Yorkville, IL (Kendall County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Completion Expected October 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 18,288 FT; Consists Of Preparation Of Base (39,373 Sy), Aggregate Subgrade Improvement (1,313 Cy), Geotechnical Fabric For Ground Stabilization (3,938 Sy), Removal And Disposal Of Unsuitable Materials (1,313 Cy), Partial Depth Patching (Special) (2,848 Sy), Hma Surface Removal - Butt Joint (103 Sy), Hma Surface Removal,2" (26,366 Sy), Hma Surface Removal,3" (2,109 Sy), Hma Surface Removal,4" (39,373 Sy), Bituminous Materials (Tack Coat) (31,480 Lb), Bituminous Materials (Prime Coat) (82,049 Lb), Hma Binder Course, Il-9.5, n50 (182 Ton), Hma Binder Course, Il-19.0, n50 (5,660 Ton), Hma Surface Course, Il-9.5, Mix "c", n50 (6,518 Ton), Combination Concrete Curb And Gutter Removal And Replacement (5,515 Lf), Sidewalk Removal (19,490 Sf), Portland Cement Concrete Sidewalk, 5" (20,021 Sf), Detectable Warnings (1,438 Sf), Manholes To Be Adjusted (7 Ea), Inlets To Be Adjusted (102 Ea), Type 1 Frame And Grate, Open Lid (15 Ea), Sanitary Manholes To Be Adjusted (17 Ea), Valve Box To Be Adjusted (13 Ea), b-Boxes To Be Adjusted (18 Ea), Thermoplastic Pavement Markings - Ltr & Sym (165 Sy), Thermoplastic Pavement Markings - Line 4" (2,041 Lf), Thermoplastic Pavement Markings - Line 6" (447 Lf), Thermoplastic Pavement Markings - Line 12" (45 Lf), Thermoplastic Pavement Markings - Line 24" (32 Lf), Hma Driveway Removal And Replacement (165 Sy), Brick Driveway Removal And Replacement (36 Sf), Bike Path Removal (2,154 Sf), Hma Bike Path Removal And Replacement (38 Sy), Sodding, Special (3,057 Sy), Supplemental Watering (15 Unit), Traffic Control And Protection (Special) (1 Lsum), Routing And Sealing Cracks (36,825 Lf). |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |