Similar Projects
Public Safety Roof Replacement - FAC-6 - Town of Andover
Alteration
Design
$150,000 est. value
Andover, MA 01810

Wastewater Treatment Plant Aeration Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Ipswich, MA 01938

Electrical Repair Services Water and Sewage
Term Contract
Sub-Bidding
$300,000 CJ est. value
Gloucester, MA 01930

Domestic Granular Activated Carbon Removal and Replacement
Renovation
Sub-Bidding
$410,000 CJ est. value
Middleton, MA 01949

Capital Improvements and Long Term O and M
Post-Bid
Lynn, MA

Essex County H.O.C. 80 Bed and Voc Tech Buildings Facade/HVAC
Post-Bid
Less than $3,155,494 est. value
Middleton, MA

Sanborn Elementary School Roof Replacement
Results
Andover, MA 01810

As Needed Roof Repair and Replacement Services
Results
Haverhill, MA

RFQ Hammond Nature Center Roof
Alteration
Post-Bid
$17,000 est. value
Marblehead, MA

Bruce School Roof Replacement - General Bid
Results
Less than $1,100,000 est. value
Lawrence, MA 01841

Roof Replacement Project - Public Safety Center
Alteration
Post-Bid
$160,000 est. value
Andover, MA 01810

Roof Inspections, Repairs and Maintenance
Term Contract
Results
North Andover, MA

Replacement of Portion of Roof
Alteration
Post-Bid
$55,000 est. value
Marblehead, MA 01945

Roof Replacement
Results
$261,000 est. value
Beverly, MA 01915

Amesbury Middle School Roof Repair
Infrastructure
Post-Bid
$80,000 est. value
Amesbury, MA

Last Updated 08/16/2022 01:36 PM
Project Title

Wastewater Treatment Facility Pump Station Roof Replacement and Associated Work

Physical Address View project details and contacts
City, State (County) Haverhill, MA 01830   (Essex County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Roofing, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $186,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Wastewater Treatment Facility Pump Station Roof Replacement and Associated Work (3,120 S.F.) Questions concerning this bid may be submitted by email to Steven Bucuzzo, Purchasing Director at sbucuzzo@cityofhaverhill.com by 4:00 PM, June 23, 2022. The project scope consists of roof replacement to the Haverhill Wastewater Division Pump Station Roof located at 20 South Mill St, Haverhill, MA. Work includes replacement of the existing low-sloped roofing system. A total of 3,120+- SF of low-sloped roofing (existing roofing system is a adhered EPDM membrane over a mechanically fastened gypsum cover board, 3.5" of insulation, and a vapor barrier adhered to the concrete deck) The existing low sloped roofing system shall be completely removed and replaced with a new multiple ply built up roof with a mod-bit granulated cap sheet over fully adhered coverboard, flat stock and tapered insulation, and a new fully adhered vapor retarder, edge metal, and flashings. B. The work also includes: (A) Repair cracked or spalled concrete decking; (B) Replace deteriorated wood blocking; (C) Install vent pipe extensions so as to maintain 18" height from finished roof surface; (D) Removal and replacement of the roof drains and snaking of all roof drains.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents