Similar Projects
Fire Station 70
New Construction
Conception
$1,580,000 est. value
Phoenix, AZ 85029

Fire Station No. 8
New Construction - 14,150 SF
Conception
$14,251,320 est. value
Peoria, AZ

Fire Station 5 Expansion
Addition
Design
$1,430,000 est. value
Yuma, AZ 85365

Police Department and Communications Center
Renovation, Addition
Design
Payson, AZ

Repair BEQ 634 MCAS Yuma
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
Yuma, AZ 85365

Theodore Roosevelt School - Residential Facility Bathroom and Laundry Remodel
Renovation
Post-Bid
Fort Apache, AZ 85926

Police Dispatch Center Expansion (CMAR)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

Construction Manager at Risk for Project 26 Replace Deteriorating Vehicle Training Track
New Construction, Renovation
Results
$19,000,000 est. value
Tempe, AZ 85281

CMAR and Construction Administration Services of A Fire Station
Results
Avondale, AZ 85323

Goodyear Police Department Building Phase II - Preconstruction and Construction
Addition
Construction
$12,000,000 to $14,000,000 est. value
Goodyear, AZ 85338

Southeast Fire Station 221
New Construction
Construction
Mesa, AZ

Northeast Police Substation
New Construction - 52,000 SF
Pending Verification
Mesa, AZ

Replace Fire Station 502
New Construction
Pending Verification
$7,000,000 est. value
Casa Grande, AZ 85122

Chandler Heights Substation Wellness Center
Renovation
Conception
$495,000 est. value
Chandler, AZ

Fire Station 7
New Construction
Design
Yuma, AZ

Last Updated 05/25/2022 11:24 PM
Project Title

San Luis Fire Station 2, Phase 1

Physical Address View project details and contacts
City, State (County) San Luis, AZ 85349   (Yuma County)
Category(s) Government/Public, Residential
Sub-Category(s) Dormitory, Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of, but is not limited to, constructing the San Luis Fire Station #2, Phase 1 (BAN-2022-01) t o b e 2,400 SF. Of the 2,400 SF, 513 SF will be for B (Business) and 1,888 SF for R-2 (Residential). Uses for the space will be separated into business, residential, dormitories, and exercise areas. Unless otherwise specified, the contractor shall furnish all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of every nature, and incidental work (including but not limited to) dust and traffic control measures

Details

Fire/Police Station, 513 SF New Construction, Dormitory, 1,888 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents