Similar Projects
PQ List for HVAC Rehabilitation, Repairs and Renovation Services (CD)
Term Contract
Bidding
Pittsburgh, PA 15219

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

LEC Baking Labs and LeJeune Chef at Penn College Removal, Furnishing and Installation of New Heating and Cooling Equipment
Post-Bid
Williamsport, PA 17701

Supply Heating and Cooling Units
Results
Williamsport, PA

Seneca Valley Aquatic Facility - HVAC Construction
Results
Harmony, PA 16037

Walker Building HVAC Upgrades
Construction
University Park, PA 16802

Radiator Covers
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Air Filter
Results
Newtown, PA

West Campus Chilled Water Plant System Expansion (Design Assist-Mechnical)
Post-Bid
University Park, PA

Furnace Retrofit/Modification/Replacement Services on Electric, Gas and Oil Fired Heating Systems and Small Plumbing Repairs
Results
Erie, PA

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

Renovation of the S&T Bank Arena - HVAC Construction
Results
Indiana, PA 15701

Construction Project, CSS# 9773 - HVAC Repairs (PA206)
Post-Bid
$25,000 to $100,000 est. value
Willow Grove, PA 19090

PA State Police Greensburg - DNA Laboratory Facility New Building - HVAC Construction
Results
$3,000,000 to $4,000,000 est. value
Greensburg, PA 15601

Capitol Complex - Automation System Upgrades
Post-Bid
Less than $3,200,000 est. value
PA

Reported 12/08/2021 12:00 AM
Project Title

KDR LEC Rooftop Unit

Physical Address View project details and contacts
City, State (County) Williamsport, PA   (Lycoming County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Removal and Disposal of existing Rooftop Unit (RTU), and Furnish and Installation of New Rooftop unit, ductwork etc.,

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents