Similar Projects
Building 0021 Florida Gymnasium Re-Roof Project
Post-Bid
Gainesville, FL

UF DHRE Housing Main Office & Beaty Commons Roof Replacements
Post-Bid
Gainesville, FL

Sheriff Office Roof Replacement
Results
Less than $820,000 est. value
Gainesville, FL 32641

Z--Remove & Replace - Approx 11,400 Sqft Flat Roof and 3428 Sqft Low-Slope Roof
Results
$250,000 to $500,000 est. value
Gainesville, FL

National Roofing Program (NRP) Design/Build 81st
Post-Bid

Glennetta Taylor Roof Replacement
Results
Gainesville, FL

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Denise Pompili Roof Replacement
Results
Less than $12,239 est. value
Gainesville, FL

Building 0092 Physics Re-Roof Phase 2
Post-Bid
Gainesville, FL 32610

Public Works Fleet Roof Replacement
Results
Less than $80,000 est. value
FL

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Post-Bid

Criminal Courthouse Roof Repairs
Results
Less than $49,803 est. value
Gainesville, FL 32601

MATOC - Army Reserve National Roofing Program (NRP)
Post-Bid
Less than $95,000,000 est. value

Santa Fe High School Roof Replacement, Building 32
Results
Alachua, FL

Howard Bishop Middle School Roof Replacement Building 30
Results
Gainesville, FL 32600

Reported 09/19/2019 12:00 AM
Project Title

Lake City Correctional Facility Reroof Phase II Project

Physical Address View project details and contacts
City, State (County) Gainesville, FL   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description Removal of the existing single ply kee roofing system and tapered insulation systems, down to the existing concrete deck. Fasten sheet metal over each structural concrete T joint. Install a fully adhered temporary membrane/vapor barrier and tapered isocyanurate insulation with high density coverboard for a R-25 insulation value. A hybrid fully adhered modified bitumen interply roofing membrane with a high solar reflectance 80 mil. PVC fleeced back cap sheet and flashing to provide a roofing manufacturer`s standard 20 year warranty. In addition, new prefinished aluminum counterflashing and PVC clad metal scupper throats in the existing scupper locations. Furthermore, removal of all abandoned roof top equipment and extending existing curbed rooftop equipment and VTR`s to a minimum of 8" above the finished roof surface is included.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents