Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Downtown Doral PS0014 Reconstruction Sanitary Sewage Pump Station
Results
Less than $2,569,209 est. value
Doral, FL 33174

Last Updated 09/04/2020 02:53 PM
Project Title

Lift Stations LS-17 (Part A) and LS-23 (Part B) Rehabilitation and Site Upgrades

Physical Address View project details and contacts
City, State (County) Jacksonville Beach, FL   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $604,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the City of Jacksonville Beach and consists of improvements at two City lift stations. Lift Station 17 (LS-17) Site (Part A) which is located between Anhinga Court and Colonies Drive, south of Declaration Drive adjacent to the existing stormwater ditch. The scope of work includes rehabilitation of the existing duplex lift station including temporary bypassing operations, equipment and limited structure demolition and site clearing and tree removal, replacement of chain link fencing around lift station and wooden gate at driveway to Anhinga Court, installation of new pumps, 8-inch piping, valves and other ancillary equipment, pump control panel, automatic transfer switch, telemetry and SCADA equipment, generator with integral fuel tank and enclosure, site light, installation of new water service and static water pressure service, removal and replacement of wet well specialty coating system, construction of new concrete slab at LS-17 site and new driveway to Anhinga Court. Lift Station 23 (LS-23) Site (Part B) which is located at the north end of 12th Street North with the wet well and valve vault in the center of the cul-de-sac and the control panel located on the pole on the west side of 12th Street North between address 1276 and 1288. The scope of work includes rehabilitation of the existing duplex lift station including temporary bypassing operations, equipment and limited structure demolition, installation of new pumps, 4-inch piping, valves and other ancillary equipment, pump control panel, telemetry and SCADA equipment, site light, installation of new water service and relocation of existing water meter, hose bibb station, repairs of wet well specialty coating system per manufacturer recommendations as necessary, construction of new concrete foundation for electrical equipment at the end of 12th Street North, and asphalt paving and striping restoration. The Contractor shall furnish all labor, equipment, tools, services and incidentals to complete all Work required by these Specifications and as shown on the Drawings. Contractor shall be responsible for properly unloading, storing, installing and maintaining all materials and equipment. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration required as a result of damages caused during this construction.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents