Similar Projects
Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$148,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

Becher Street Multifamily / Milwaukee
New Construction, Infrastructure
Bidding
$95,000,000 CJ est. value
Milwaukee, WI 53207

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

Jones Island Water Reclamation Facility, Building 203 Grit Dewatering Screws #1, 2 and 3 Repairs
Renovation
Post-Bid
$125,000 est. value
Milwaukee, WI 53207

Milorganite Fertilizer Transport and Silo Storage Equipment Replacement at Jones Island Water Reclamation Facility
Renovation
Results
$11,931,000 CJ est. value
Milwaukee, WI 53207

West Plant Return Activated Sludge Channel Repair
Renovation
Results
$1,195,302 CJ est. value
Milwaukee, WI 53207

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Jackson Park - W40009 - Milwaukee Metropolitan Sewerage District
Infrastructure
Conception
$41,647,900 CJ est. value
West Milwaukee, WI 53215

Cornerstone Village Wauwatosa
New Construction, Infrastructure - 9,796 SF
Design
$31,000,000 CJ est. value
Wauwatosa, WI 53213

Last Updated 10/11/2023 01:03 PM
Project Title

Howard Filter Rehabilitation

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53221   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $8,831,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

REHABILITATION WORK TO REMOVE AND REPLACE THE FILTER UNDERDRAINS FOR FILTER NO. 4, NO. 5, NO. 6 AND NO. 7 INCLUDING ASSOCIATED FILTER MEDIA AT THE MILWAUKEE WATER WORKS (MWW) HOWARD AVENUE WATER TREATMENT PLANT. Time for Completion: NOVEMBER 29, 2024 SUBSTANTIAL COMPLETION FEBRUARY 10, 2025 FINAL COMPLETION The SBE requirement for this project is 15% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website. The apprenticeship requirements for this project are: 1- Construction Craft Laborer. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. All attendees are required to e-mail tchen@milwaukee.gov and anthony.aquila@milwaukee.gov at least 24 hours in advance of the Pre-Bid Meeting to be placed on the visitor list for access to the Howard Water Treatment Plant. The City of Milwaukee will ONLY receive bids from prospective bidders who are in attendance at the MANDATORY Pre-Bid Meeting. AMERICAN IRON AND STEEL (AIS): All iron and steel products provided by the contractor shall be produced in the United States and comply with the American Iron and Steel Requirement (AIS). PAYROLL MONITORING REQUIREMENTS: The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's Labor Compliance Reporting (LCR) Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCR. Please contact the DPW Contracts Of ice at 414-286-3314 should you have any questions or concerns regarding the training or reporting process.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents