Similar Projects
Last Updated | 10/11/2023 01:03 PM |
Project Title | Howard Filter Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53221 (Milwaukee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $8,831,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | REHABILITATION WORK TO REMOVE AND REPLACE THE FILTER UNDERDRAINS FOR FILTER NO. 4, NO. 5, NO. 6 AND NO. 7 INCLUDING ASSOCIATED FILTER MEDIA AT THE MILWAUKEE WATER WORKS (MWW) HOWARD AVENUE WATER TREATMENT PLANT. Time for Completion: NOVEMBER 29, 2024 SUBSTANTIAL COMPLETION FEBRUARY 10, 2025 FINAL COMPLETION The SBE requirement for this project is 15% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website. The apprenticeship requirements for this project are: 1- Construction Craft Laborer. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. All attendees are required to e-mail tchen@milwaukee.gov and anthony.aquila@milwaukee.gov at least 24 hours in advance of the Pre-Bid Meeting to be placed on the visitor list for access to the Howard Water Treatment Plant. The City of Milwaukee will ONLY receive bids from prospective bidders who are in attendance at the MANDATORY Pre-Bid Meeting. AMERICAN IRON AND STEEL (AIS): All iron and steel products provided by the contractor shall be produced in the United States and comply with the American Iron and Steel Requirement (AIS). PAYROLL MONITORING REQUIREMENTS: The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's Labor Compliance Reporting (LCR) Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCR. Please contact the DPW Contracts Of ice at 414-286-3314 should you have any questions or concerns regarding the training or reporting process. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |