Similar Projects
Reported 10/05/2021 12:00 AM
Project Title

EPA Certified Lead Abatement Contractors

Physical Address View project details and contacts
City, State (County) Mount Vernon, NY 10550   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Soffit & Fascia Board: The Contractor shall supply all materials, labor, and equipment necessary to enclose the specified: Any deteriorated wood fascia or rakes shall be replaced with like material prior to the installation of the aluminum coil stock. Color shall be chosen by the homeowner and be either white or brown. All of the above shall be manufactured by Alcoa, or approved equal. All seams/joints to be caulked/sealed. All debris associated with the above installation shall be removed from the premises. VINYL SOFFIT: The Contractor shall supply all materials, labor, and equipment necessary to enclose the specified porch ceiling with new vinyl soffit material. Contractor will provide all necessary ā€œJā€ or ā€œFā€ channel in vinyl. All of the above shall be manufactured by Alcoa, or approved equal. All debris associated with the above installation shall be removed from the premises. Window CAPPING: The Contractor shall supply all materials, labor, and equipment necessary to enclose the specified: The existing exterior window frames, sills, & casings shall be capped with aluminum coil stock. Any deteriorated wood will be repaired or replaced with like material prior to the installation of the aluminum coil stock. Color shall be chosen by the homeowner and be either white or brown. All of the above shall be manufactured by Alcoa, or approved equal. All seams and joints to be caulked and sealed. All debris associated with the above installation shall be removed from the premises. Windows: The Contractor shall supply all materials, labor and equipment necessary to remove the existing windows, and to install new vinyl double-hung, and or slider replacement windows where specified. Once windows are installed, new aluminum coil stock shall be installed on the exposed exterior window casings, sills, stops, etc. The entire window shall then be caulked in all joints and seams. On the interior of the window, all casing, sills, stops, mullions and aprons shall be encapsulated with white encapsulating paint and then painted with one coat of white Benjamin Moore latex semi-gloss paint.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials, Lead Remediation, Lead-Based Paint Remediation, Lead-Based Paint Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents