Similar Projects
Last Updated | 01/31/2023 11:15 AM |
Project Title | Aquatics Locker Room Rehabilitation - Electrical Contract |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10031 (New York County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $716,304 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 31, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Question Deadline 11/22/2022 at 1:00 PM ET Sealed bids for Electrical Construction Construction at the Aquatics Facility of Denny Farrell Riverbank State Park, 679 Riverside Drive, New York, New York. 1. Mobilization and establishment of site perimeter fencing and maintenance and protection of existingconditions. 2. General demolition and removals of partitions, finishes, accessories, and fixtures within the aquaticslocker rooms, showers, and restrooms and staff areas. 3. General demolition and removals of damaged exterior tiles at West Stair Tower. 4. Provide and install temporary restroom trailers and necessary electrical and plumbing accessories duringconstruction. 5. Provide and install temporary rinse showers on pool deck and necessary plumbing accessories duringconstruction. 6. Provide and install temporary changing tents and staff tents during construction. 7. Reconfiguration of the aquatics locker rooms and restrooms to include new gender-neutral locker room,new multipurpose room, and reconfigured staff area. 8. Rehabilitation of the existing lobby, locker rooms, and staff areas to include new accessories, fixtures,finishes, wall partitions and equipment. 9. Provide and install new finishes and fixtures within the limits of architectural scope of work. 10. Provide and install new light fixtures, public address system, smoke detectors, power & data within thelimits of electrical scope of work. 11. Provide and install new sprinklers within the limits of plumbing and fire protection scope of work. 12. Provide and install new HVAC diffusers and ductwork within the limits of mechanical scope of work. 13. Provide and install new windows in the lobby and install exterior tile patch around window. 14. Provide and install exterior patch at West Stair Tower within the limits of architectural and structuralscope of work. 15. Provide all necessary permits. 16. Closeout documents including warranties. Minority Owned Business Enterprise (MBE) 9% Service-Disabled Veteran Owned Business 6% The completion date for this project is 270 calendar days after agreement has been approved by the NYS Comptrollers Office. The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. By submitting a bid, the Bidder agrees not to make any claim for, or have any right to, damages because of any misinterpretation or misunderstanding of the specifications, or because of any misinformation or lack of information. Bids containing false or misleading statements, or which provide project contacts that do not support an attribute or condition claimed by a Bidder, may be disqualified from consideration. If, in the opinion of OPRHP, a statement is intended to mislead OPRHP in its evaluation of the bid, and the attribute, condition, or capability is a requirement of the IFB, the bid shall be disqualified from consideration. In the event there is a tie final determination will be made by the OPRHP Deputy Commissioner for Capital. Bid modifications that are submitted in writing and signed by an authorized representative of the bidding firm will be considered for award if received by OPRHP prior to the scheduled proposal due date. Bids may be withdrawn or cancelled prior to the scheduled proposal due date. A bid may be rejected by OPRHP: if it shows any alteration of terms, conditions, or requirements; for any other irregularities; if it is incomplete, or if it offers an alternate bid not invited by the specifications. For contract opportunities subject to the approval of the Office of the State Comptroller, the protesting party may appeal OPRHPs protest determination to the Office of the State Comptroller in accordance with the regulations contained in Part 24 of Title 2 of the New York Codes, Rules and Regulations. For contract opportunities that are not subject to the approval of the Office of the State Comptroller, OPRHPs protest determination is the conclusive and final determination of the protest. Nothing in these bid protest procedures is intended to limit or impair the rights of any bidder to seek and pursue remedies of law through the judicial process. Estimate Range: $1,600,000.00 - $2,200,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |