Last Updated | 09/28/2022 02:06 PM |
Project Title | 2022 Sanitary Sewer Replacement |
Physical Address | View project details and contacts |
City, State (County) | Eagleville, PA 19403 (Montgomery County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,691,506 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of September 14, 2022, the project has been awarded. A timeline for construction has not been confirmed. Replacement of approximately 1,704 LF of 8-inch VCP sewer pipe, 105 LF of replacement 8-inch DIP sewer pipe, 1,665 LF of replacement 10-inch VCP sewer pipe, 613 LF of pipe bursting 8-inch VCP with 8-inch HDPE sewer pipe, associated laterals, replacement of 19 manholes, 44 LF of replacement 15-inch HDPE storm sewer, 80 LF of replacement 18-inch HDPE storm sewer and 42 LF of replacement 30-inch HDPE storm sewer. The Authority owns a 6-foot diameter precast concrete manhole consisting of the base and a 5-foot high 6-foot diameter wall section that must be used at one of the drop manhole locations in the Regency Drive Project Area shown on the Drawings. The manhole was manufactured by Atlantic Concrete in 2021 and is located behind the Lower Providence Fire House at the intersection of E. Mt. Kirk Ave. and Ridge Pike. The manhole will require core drilling and the bench modified to accommodate an 8-inch sewer pipe. Item No. 76 in the Bid Form is for moving and installing this manhole in the Project Area. CLARIFICATION DEADLINE 5/20/2022 4:00 PM The Work shall be substantially completed within 210 days after the date when the Contract Times commence to run *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |