Similar Projects
Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

2023 CPP Site Improvement Projects
Infrastructure
Bidding
$500,000 CJ est. value
Fort Wayne, IN 46802

2023 Build-Learn-Grow Pre-K Accessibility Project
Infrastructure
Bidding
$125,000 CJ est. value
Fort Wayne, IN 46802

RFQ - Franke Park Renaissance Project Phase 1
Renovation, Infrastructure
Sub-Bidding
$16,755,000 CJ est. value
Fort Wayne, IN 46808

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Street Package
Infrastructure
Post-Bid
New Haven, IN

Green Road Improvements Phase 2
Results
$807,478 est. value
New Haven, IN 46774

Abandoned Coal Mine Restoration
Results
$150,000 est. value

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

Isabelle Gardens
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fort Wayne, IN 46805

Premier Riverfront Property
New Construction, Infrastructure - 60,000 SF
Design
$70,000,000 CJ est. value
Fort Wayne, IN 46802

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

Last Updated 11/16/2022 02:04 AM
Project Title

Pontiac Street Streetscape

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46803   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,285,818 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Removing and replacing sidewalks and drive approaches from Hanna Street to Smith with two alternates possibly extending the streetscape to either Oliver or Bowser with an eight-foot concrete trail on the north and five-foot walk on the south. The driving lane widths will be decreased to accommodate the new trail and new landscaping areas with new trees and bioswale areas. There will also be upgrades to the ADA ramps, storm drainage, new street lighting placements, and an alternate for possible crosswalk and intersection upgrades. Several areas will get a brick paver treatment adjacent to the concrete walk and trail, and also installation of site furnishings in various locations. EBE GOALS - The Citys goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents