Similar Projects
Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

Sanitary Services
Infrastructure
Post-Bid
Madison, WI

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

Sanitary Sewer Lining Replacement
Results
Less than $140,000 est. value
Madison, WI 53704

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

West Interceptor Shorewood Relief Phase 1
Results
$5,400,000 est. value
Madison, WI

2021 East Side Sewer Extension
Results
McFarland, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021
Renovation
Results
$4,348,305 est. value
Madison, WI 53715

2021 CTH MN/Broadhead Street Utility and Street Improvements
Results
McFarland, WI 53558

Onderdonk Lift Station Removal - Street and Utility Improvements
Results
Monona, WI

CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021
Results
$1,117,955 est. value
Madison, WI

Last Updated 10/13/2021 10:05 AM
Project Title

Northeast Interceptor Joint Grouting MH10-106 to MH10-101

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes all work necessary to pressure test, grout seal, and verify successful elimination of infiltration at joints occurring from MH10-106 to MH10-101. The Contractor shall provide all materials, labor, equipment, and services necessary for traffic control, wetland protection & access, diversion of sewerage flows and bypass pumping (if needed), cleaning and television inspection of joints pre-grouting, pressure testing, grouting, and verification of joints using the packer injection method, television inspection of joints post-grouting, and all other work required for a successful installation of the improvements.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents