Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Visitor Center Breezeway and Bridge Restoration 36698
Renovation, Infrastructure
Design
$250,000 to $500,000 est. value
Harpers Ferry, IA 52146

2022 Institutional Roadway Improvements Project
Infrastructure
Bidding
$400,000 est. value
Cedar Rapids, IA 52404

2022 Old Hoover Elementary Demolition and City High Tennis Court Project
New Construction, Infrastructure
Bidding
$2,350,000 est. value
Iowa City, IA 52245

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

PCC Curb and Gutter
Infrastructure
Bidding
$125,000 to $250,000 est. value
Spencer, IA 51301

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

2022 Parking Lot Improvement Project
Infrastructure
Bidding
$400,000 est. value
Clinton, IA 52732

Last Updated 05/06/2022 04:09 AM
Project Title

PCC Sidewalk/Trail - S34 T72 R34

Physical Address View project details and contacts
City, State (County) IA   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In The City Of Corning, Hull Street, From Hull Street Bridge Replace Nw 0.32 Miles To School Sports Complex s34 t72 r34 181.00 Square Yard Drives, p.c.c. 454.00 Cubic Yard Excavation Class 13 76.00 Ton Granular Shoulders, Type a 1.00 Each Intakes & Manholes/Utility Access 0.50 Acre Mulching 139.00 Square Yard Patches, Full-Depth 1,742.00 Square Yard Recreational Trail, Pcc 669.00 Square Yard Removal Of Pvmnt/Drives/Sdwk 0.50 Acre Seeding & Fertilizing 10.00 Linear Foot Sewer, Storm 193.00 Cubic Yard Topsoil, Strip/Salvage/Spread

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents