Similar Projects
LA 931 at Roddy Rd. and Joe Sevario Rd.
Infrastructure
Design
$2,500,000 CJ est. value
Gonzales, LA 70737

LA 98: LA 35 - Llama Road
Infrastructure
Design
$2,500,000 CJ est. value
Rayne, LA 70578

LA 35: N. Jct. LA 98 - LA 365
Infrastructure
Bidding
$10,000,000 CJ est. value
Rayne, LA 70578

LA 35: N. Jct. LA 98 - LA 365
Infrastructure
Bidding
$10,000,000 CJ est. value
Rayne, LA 70578

O'Reilly Auto Parts (BC4) #6537 / Bossier City
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Bossier City, LA 71112

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Expansion of Wastewater Collection System Airline Drive
Addition
Results
Benton, LA

Magnolia Chase Force Main and Lift Station Improvements
Renovation, Infrastructure
Results
Benton, LA

Preston Crownover Artificial Turf Field
Infrastructure
Construction
$1,168,700 CJ est. value
Bossier City, LA 71112

Shell Chemical Geismar Plant Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,200,000,000 CJ est. value
Geismar, LA 70734

CF Industries Ammonia Facility
New Construction, Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Donaldsonville, LA 70346

PR 929 Overlay : US 61 - LA 42
Infrastructure
Design
$2,500,000 CJ est. value
Prairieville, LA 70769

LA 621 At Roddy Rd
Infrastructure
Bidding
$2,500,000 CJ est. value
Gonzales, LA 70737

Gonzales 16" Water Main Relocation on Roddy Road
Infrastructure
Post-Bid
LA

Water System Improvements
Infrastructure
Results
$1,494,900 CJ est. value
Mansura, LA 71350

Last Updated 04/16/2023 06:01 AM
Project Title

Wastewater Treatment Pond Improvements

Physical Address View project details and contacts
City, State (County) Kinder, LA 70648   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,284,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any bid received after the specified time and date will not be considered. The Instructions to Bidders, Bid Form, Agreement Between Owner and Contractor, Forms of Bid Bond, Performance and Payment Bonds, Drawings and Specifications, and other Contract Documents may be examined at the following location: PAN AMERICAN ENGINEERS, LLC (Design Professional) 1717 JACKSON STREET (P.O. BOX 8599, 71306) ALEXANDRIA, LOUISIANA 71301 (318) 473-2100 On other sets of documents furnished to bidders, the deposit less actual cost of reproduction will be refunded upon return of the documents, in good condition, no later than ten (10) days after receipt of bids. Work to Be Done: Modifications to the Towns Wastewater Treatment Pond including baffle walls for cell separation, floating cell cover, polishing reactor, disinfection, sewer force main, levee embankment and shore protection, etc. and all related appurtenances. accordance with Title 38 of the L.R.S. Description of Site: The project site is located at the Town of Kinder existing wastewater treatment pond on Nielson Road (PR 114) 1.93 mile +- east of U.S. Hwy 165.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents