Augustine Heights Detention Basin
Infrastructure
Bidding
Eureka, MO

Baden Cityshed Mitigation Basins (Calvary, Frederick, Partridge, and Tillie) - Sep Sewer
Infrastructure
Bidding
$5,820,000 est. value
Saint Louis, MO

Union Road 100 Block Storm Improvements
Post-Bid
Saint Louis, MO 63114

Great Rivers Greenway Connector Project Part A
Infrastructure
Post-Bid
$3,000,000 est. value
Brentwood, MO 63144

Stanwood Dr and Belwood Dr Storm Sewer & Bank Stabilization
Results
$351,000 est. value
Normandy, MO 63121

Euclid 4130 and 4136 Bioretention CSO VR GI
Results
$250,000 est. value
Saint Louis, MO

Oxford 7500 Storm Replacement
Infrastructure
Bidding
$140,000 est. value
Clayton, MO

Harlem Baden - PHASE 3
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Saint Louis, MO

Minnie Ave to Greenhaven Storm Sewer Separation
Results
$183,000 est. value
Flordell Hills, Jennings, MO

Broadhead 921 Storm Sewer
Infrastructure
Post-Bid
Less than $250,000 est. value
MO

Willow Hill Stormwater Infrastructure
Results
Ladue, MO 63124

Marie Baxter Acres Stormwater Improvements
Infrastructure
Post-Bid
Manchester, MO

Coeur Dalene Storm Sewer Repair
Results
$153,000 est. value
Chesterfield, MO

Conway Park Path Improvements Project
Infrastructure
Post-Bid
Creve Coeur, MO

Big Bend Woods 730 Storm Main Replacement
Infrastructure
Results
$125,000 est. value
Saint Louis, MO

Reported 12/03/2021 12:00 AM
Project Title

Meadow Run Court Stormwater Improvement

Physical Address View project details and contacts
City, State (County) Maryland Heights, MO 63043   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the construction of a subsurface storm sewer system to intercept and convey stormwater from a drainage corridor in the rear yards of Meadow Run Court and Meadow Grove Court. The project intent is to provide adequate storm sewer systems, reduce flooding and decrease erosion in the project area by directing the stormwater to existing storm sewers which discharge to Fee Fee Creek. The proposed improvement consists of approximately 143 linear feet of 12-inch Class III reinforced concrete piping, five (5) new storm sewer structures, adjustment of an existing inlet to new grade, and grading to provide positive drainage to all new or adjusted inlets. The scope of work includes the removal of select trees and other vegetation, removal of improvements, earth grading operations, the construction/placement of storm sewers, manholes, area inlets, concrete pavement and integral curb, fencing and sodding.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents