Similar Projects
Jasper Parkway South
Infrastructure
Design
Prescott Valley, AZ 86314

Mingus Avenue (8th Street to Main Street) Project
Bidding
Cottonwood, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Y--Badger Springs Recreation Site Roads
Results
$150,000 to $250,000 est. value
Black Canyon City, AZ 85324

System Enhancement-Other Enhancements
Results

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

Viewpoint Drive Connector
Results
Prescott Valley, AZ 86314

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Verde Valley School Road Overlay
Results
$562,200 est. value
Prescott, AZ 96305

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

2019-2020 Chip Seal
Results
Less than $947,300 est. value
Prescott, AZ

Road 2 North Paving Improvements Project
Post-Bid
$800,000 est. value
Chino Valley, AZ

Pavement Rehabilitation
Results
Less than $2,210,000 est. value
AZ

Last Updated 06/04/2021 05:46 AM
Project Title

Drake Road Paving Improvements

Physical Address View project details and contacts
City, State (County) Prescott, AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $947,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work for this project includes furnishing of all labor, materials, equipment, fixtures, and services required for extending pavement on Drake Road from the entrance of Drake Cement Plant to Forest Service Road 9899N with 6" asphaltic concrete over 15" aggregate base, then continuing paving through Prescott National Forest Land with 3" asphaltic concrete over 8" aggregate base, and ending project at Forest Service Road 9031F. The total project length is 5,248 feet with approximately 6,400 cubic yards of roadway excavation, 3,760 tons of asphaltic concrete and 4,660 cubic yards of aggregate base. As part of the project, approximately 3,000 feet of existing Drake Road shall be realigned to provide better and safer transportation experiences; the remaining 1,758 feet of the paving shall be performed within existing roadway prism.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents