Similar Projects
STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

Business Park Road Manufacturing Development / Wisconsin Dells
Addition, Demolition, Infrastructure - 9,600 SF
Design
$1,036,800 CJ est. value
Wisconsin Dells, WI 53965

S&L Companies Building Addition
Addition, Infrastructure - 14,800 SF
Design
$3,000,000 CJ est. value
Portage, WI 53901

Grading, Milling, Base, Asphalt Pavement - STH 113
Infrastructure
Bidding
$3,999,999 CJ est. value
Lodi, WI 53555

Grading, Milling, Base, Asphalt Pavement - STH 113
Infrastructure
Bidding
$3,999,999 CJ est. value
Lodi, WI 53555

CTH J Asphalt and Concrete Surface Removal
Infrastructure
Post-Bid
WI

Road Milling Projects
Infrastructure
Post-Bid
WI

Unke Road Improvements
Renovation, Alteration
Results
$150,000 est. value
Lodi, WI

C. Columbus, Farnham Street, 0.32 Mi. S. of Avalon Road to Park Avenue
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

The View Porte Cochere and Cold Storage Ramp Addition
Addition, Demolition, Infrastructure
Pending Verification
$300,000 CJ est. value
Wisconsin Dells, WI 53965

Kwik Trip Store #808 Rebuild / Columbus
Demolition, New Construction, Infrastructure - 10,984 SF
Pending Verification
$2,000,000 CJ est. value
Columbus, WI 53925

Town of Scott, Inglehart Road - Construct Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

Last Updated 07/07/2023 07:34 AM
Project Title

2023 Oak & Elm Street North Parking Lot Reconstruction

Physical Address View project details and contacts
City, State (County) Wisconsin Dells, WI 53965   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $469,324 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer (Gravity), Stormwater Improvements, Roadway Pavement Markings, Parking Lots/Ramps, Roadway Lighting, Sidewalks/Curbs/Gutters, Concrete/Formed/Flatwork/Foundation, Utility Street Construction and Excavation, Electrical Installation/Construction, Traffic Control Devices (Signals, Signing, etc.), Concrete/Shotcrete/Sprayed, Paving (Parking Lot Paving), Signage, Erosion Control - Temporary, Paving (Asphalt or Concrete) Description: The work for which bids are asked includes the following: Replacement of approximately 360 feet of City utilities, reconstruction of approximately 4,200 square yards of urban parking lot and alley, existing surface removals, unclassified excavation, parking lot grading, roadway grading, sanitary sewer, storm sewer, concrete curb and gutter, concrete flatwork, concrete sidewalk, electrical conduit, associated lighting, asphalt paving, pavement markings, and signing. Additional Description: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913.The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City Of Wisconsin Dells. Interpretations or clarifications considered necessary by 7 ENGINEER in response to such questions will be issued by Addenda mailed or delivered to 8 all parties recorded by ENGINEER as having received the Bidding Documents. Questions 9 received less than ten days prior to the date for opening of Bids may not be answered.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents