Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Gulf Shores Justice Center
New Construction, Infrastructure
Bidding
$26,000,000 CJ est. value
Gulf Shores, AL 36542

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

City-Wide Road Repair, Resurfacing and Striping Project
Infrastructure
Results
Fairhope, AL

Juniper Street Extension
Infrastructure
Results
$3,500,000 to $4,000,000 est. value
Foley, AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Kinderkids Daycare
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Harbor Club Condominiums / Orange Beach
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Orange Beach, AL 36561

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

CID Highway 181 Eastern Shore Center Roadway Improvements
Infrastructure
Results
Spanish Fort, AL 36527

Last Updated 12/15/2023 03:02 PM
Project Title

Waterway Village Detour for Pedestrian Bridge Over the Intracoastal Waterway

Physical Address View project details and contacts
City, State (County) Gulf Shores, AL 36542   (Baldwin County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include the streetscape improvements to the existing roadways of State Highway 180, East 22nd Avenue, East 3rd Street, and East 24th Avenue. The proposed work will also include temporary traffic control, erosion control, drainage improvements, and landscaping. All bidders must make positive efforts to use small and minority owned business and women business enterprises. Minority and women's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs. The Contractor will be required to obtain a business license from the City to operate within the Corporate Limits All bids in excess of Fifty Thousand Dollars ($50,000) shall require a bid bond equal to 5% of contract amount or $10,000 whichever is lesser. Bid bonds will be returned by the Owner after the contract has been awarded. See ALDOT's 2022 Standard Specifications Article 108.11 for schedule of liquidated damages. Upon receipt of the Notice to Proceed, the Contractor shall commence the work within ten (10) days from the Date of the Notice and shall complete the work within One Hundred and Eighty (180) calendar days from the date of the Notice. Contact Shelby DeBlieux at (251) 968-1443 or sdeblieux@gulfshoresal.gov with any questions.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents