Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Binney Connection Project Treatment and Pumping Package
New Construction
Post-Bid
$19,000,000 est. value
Aurora, CO 80010

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Ridgegate First Street Lift Station
Results
Lone Tree, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Last Updated 10/05/2020 01:44 PM
Project Title

Tuscany Tract O Irrigation Pump Skid

Physical Address View project details and contacts
City, State (County) Evans, CO   (Weld County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor,materials,supplies,equipment,tools,and transportation, and perform all operations in connection with, and reasonably incidental to, the complete manufacturing of the vertical turbine pumping system, and guarantee/warranty as shown on the drawings, the installation details, and as specified herein. Items of work specifically included are: A. Procurement of all applicable licenses, permits, and fees as required by local utilities and regulations. B. Coordination of Utility Locates (“Call Before You Dig”) C. Services of a factory-trained field service person, authorized by the pumping system manufacturer, to supervise the assembly, installation, and start-up of the pumping system, and provide training for City of Evans maintenance staff, and assist with provision of O&M manual. D. Furnishing and installation of a prefabricated, vertical turbine type pumping system including pumps, motors, electrical controls, water level controls and other items as specified. E. Maintenance period; thirty (30) calendar days from written acceptance of corrective actions from Final review.

Details

Division 32 - Exterior Improvements, Irrigation Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents