Similar Projects
Rural Street Underpass Clearance (Construction) - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$6,571,000 CJ est. value
Indianapolis, IN 46218

South Madison Park and Ride - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$2,100,000 CJ est. value
Indianapolis, IN 46204

AutoZone #5765 / Indianapolis
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46217

Culver's - Southern Plaza / Indianapolis
New Construction, Infrastructure - 4,800 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46227

Intersect. Improv. W/ Added Turn Lanes
Infrastructure
Bidding
$8,337,325 CJ est. value
Indianapolis, IN 46227

Valvoline / Indianapolis
New Construction, Infrastructure - 2,087 SF
Bidding
$551,000 CJ est. value
Indianapolis, IN 46237

Asphalt Paving and Site Improvements
Post-Bid
Indianapolis, IN 46214

Lawrence 2022 Sewer and Manhole Rehabilitation
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Lawrence, IN 46226

Leonard Park Phase 2 - Site & Building Improvements
Infrastructure
Results
Speedway, IN 46224

Building 239 Repairs
Renovation
Results
Indianapolis, IN

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

Cardinal Grove Residences
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Indianapolis, IN 46221

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

Liquor Cabinet Expansion and Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Indianapolis, IN 46203

Super Stop 2.0 Alabama, Ft Wayne and Vermont Stations, 2 Each - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$2,617,322 CJ est. value
Indianapolis, IN 46204

Last Updated 04/29/2023 10:31 AM
Project Title

VALE 2020 - GSE Electric Charging, FedEx

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46241   (Marion County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Online Q&A Yes Q&A Deadline 03/27/2023 3:00 PM (EDT). The agreed scope of work for accomplishing specific airport development with respect to a particular airport.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents