Similar Projects
Birch Force Main
Renovation
Results
Nampa, ID

Western Regional Lift Station
Renovation
Results
Nampa, ID

Booster Station Replacement - Phase II
Renovation
Results
$2,800,000 to $3,100,000 est. value
Moscow, ID

Parkcenter Park Pump Station Improvements
Renovation
Results
Boise, ID 83706

P Street Lift Station Replacement
Renovation
Post-Bid
$164,000 est. value
Plummer, ID

Bentley Lift Station Rehabilitation Pre-Qualification
Renovation
Results
Post Falls, ID

Last Updated 06/17/2022 01:42 AM
Project Title

Construction of the Palmer Lift Station Upgrade Project

Physical Address View project details and contacts
City, State (County) Eagle, ID 83616   (Ada County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of installation of two new centrifugal pumps and required mechanical and electrical connections, installation of a gate actuator, new electrical equipment serving the new pumps and removal of existing fire suppression system. Locatedlon the east side of Palmer Lane, approximately 0.5 mile north of State Highway 44 in Eagle, ID

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents