Similar Projects
Calas Park And Foisia Park Roof Repair - PW1416
Renovation, Alteration
Conception
$492,495 est. value
Carson, CA

Contractor - FY22 Angeles National Forest Roofing Project
Alteration
Design
$700,000 est. value
San Fernando, CA 91342

2023 District Office 1 Superintendent Roofing Project
Term Contract
Design
$200,000 CJ est. value
Pico Rivera, CA 90660

City Hall Roof Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Claremont, CA 91711

Deferred Maintenance Fy21-22 Co-gen Roof Renovation
Renovation
Sub-Bidding
$400,000 CJ est. value
Los Angeles, CA 90095

Reservoir No. 7 Roof Replacement
Alteration
Post-Bid
$600,000 est. value
La Canada Flintridge, CA 91011

Tower Roof Repair/Maintenance
Alteration
Post-Bid
Long Beach, CA 90815

Roof Repair and Replacement Services
Alteration
Results
CA

Roof Repair and Replacement Services
Infrastructure
Results
$500,000 est. value
Los Angeles, CA 90040

UCLA Deferred Maintenance FY21-22 Young Hall Roof Renovation
Renovation
Sub-Bidding
$1,145,700 CJ est. value
Los Angeles, CA 90024

Operations and Storage Facilities Phase III Construction of New Roof Structure over Existing Fish Tanks Platform
Renovation
Post-Bid
$268,380 CJ est. value
Culver City, CA 90230

Corporate Yard Roof Replacement
Alteration
Results
$200,000 est. value
Cerritos, CA 90703

Roof Replacement, Restore, Repair at Greenwood Elementary School
Alteration
Post-Bid
$600,000 est. value
Montebello, CA 90640

Roof Replacement - Agoura High, Bay Laurel Elementary, Round Meadow Elementary Schools
Alteration
Results
$585,000 est. value
Agoura Hills, Calabasas, Hidden Hills, CA 91301

Roofing and Gutter Project Unit Price Bid
Alteration
Post-Bid
$2,000,000 est. value
Azusa, CA

Last Updated 09/20/2023 03:18 PM
Project Title

6946 Van Nuys Roof Replacement

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 91405   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $404,048 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 20, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Bid date has been extended The Contractor shall furnish all labor, miscellaneous materials, equipment, disposal bins, services and transportation required for the replacement of the existing roof in our Valley office building, which is a two-story Type B office building located at 6946 Van Nuys Blvd, Van Nuys, CA 91045 with a cool roof. This building was constructed in 1973 and has a square footage of 21,256. The roof measures approximately 16,832 SQFT with 10 skylights and 14 HVAC package units. Deadline for Submission of Written Questions and Requests for Information. Any prospective bidder seeking an explanation or interpretation of this IFB may submit, in writing, questions and requests for information to the Contracts Administrator identified herein. Written questions must be received on or before August 21, 2023, at 11:00 a.m. (PST). Please contact Timothy Shay, Contracts Administrator, for questions concerning this solicitation: Housing Authority of the City of Los Angeles General Services Department Attn: Timothy Shay, Contracts Administrator 2600 Wilshire Boulevard, 4th floor Los Angeles, California 90057 Phone: (213) 544-7005. Email: timothy.shay@hacla.org To view the virtual bid opening: 1. Click this URL to start or join https://meet.goto.com/336199405 2. Participants must enter their full name and company to join. To listen to the audio portion of the virtual bid opening: 1. Dial: 1-872-240-3212 2. Meeting ID: 366-199-405 LAST DATE FOR WRITTEN QUESTIONS: 8/21/2023 Each bidder must submit with its bid a bid guarantee equivalent to 5% of the bid price.1 The bid guarantee may be in the form of a certified check, bank draft, U.S. Government Bonds at par value, a bid bond secured by an acceptable surety company, or any other negotiable instrument acceptable to HACLA's Contracting Officer. If a surety bond is posted as Bid Security, the bond shall be issued by an admitted surety insurer that is listed on the most recently published U.S. Treasury Circular No.570, and the bond's expiration date shall not be less than 120 days after the scheduled date of bid opening. If the successful bidder refuses to sign the contract after award, the bid bond will be forfeited. Any bid submitted without the required bid guarantee may be rejected as non-responsive. The Contractor awarded the Contract will be required to post a Payment Bond to secure payment of all claims, demands, stop notices, mechanics liens, or charges of Material Suppliers, mechanics, or laborers employed by Contractor or by any subcontractor or any person, firm, or entity eligible to file a stop notice with respect to the Work. If the Contractor will perform Work on an as-needed, ongoing basis, the amount of the payment bond required to be posted is 100% of the value of the first year of the Contract, as determined by HACLA. If this is a design-build project, the amount of the payment bond required to be posted is 100% of the value of the construction portion of the Work. Otherwise, the payment bond amount will be 100% of the Contract award. Contractor is responsible for all related bond costs; Contractor will not be reimbursed for any bond costs. The bond shall be issued by an admitted surety insurer. The Contractor awarded the Contract will be required to post a Performance bond as a guarantee of the faithful performance of the requirements of this Contract in the amount of not less than one hundred percent (100%) of the contract award. Contractor is responsible for all related bond costs; Contractor will not be reimbursed for any bond costs. The bond shall be issued by an admitted surety insurer. Pursuant to California Public Contract Code section 22300, the Contractor may request that HACLA substitute a security in the amount of the performance retention. The projected start date is within 10 days of successful bidder's contract execution. The projected time for completion is 90 calendar days.

Details

16,832 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents