Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Job Order Contracting Services for New Water Meter Service Installations
Term Contract
Results
Tampa, FL 33602

FFY2018 CDBG Neighborhood Revitalization Project
Results
Less than $700,000 est. value
Milton, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Meter Set Installation and Exchanges
Results
$335,000 est. value
Kissimmee, FL 34741

SR 50 Water Main Replacement Phase 2
Post-Bid
Mascotte, FL 34753

Chilled Water Pipe Replacement - Dental Science Building Floors 8, 9 and 10
Results
Less than $368,000 est. value
Gainesville, FL 32610

CDBG Water Main Upgrades and Well No. 1 Generator 2018
Post-Bid
Grand Ridge, FL 32442

Reduced Pressure Principle Backflow Prevention Assemblies
Results
FL

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Last Updated 05/11/2021 10:51 AM
Project Title

Hill-N-Dale Water Main Replacement

Physical Address View project details and contacts
City, State (County) FL   (Hernando County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of new water mains and fire hydrants in the Azen Loop service area of the Hill-n-Dale subdivision to replace the existing aging water mains. This project will also abandon the existing water mains and meters that are in the customers back yards and replace them with new water mains and meters that will be installed in the road right-of-way for easier maintenance. The Contractor shall furnish all labor, vehicles, fuel, tools, equipment, parts, supplies, materials, and fees necessary to accomplish the work set forth in a timely and professional manner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents