Similar Projects
SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Reported 06/02/2020 12:00 AM
Project Title

Yampa River Channel Restoration & Access Design

Physical Address View project details and contacts
City, State (County) Steamboat Springs, CO 80477   (Routt County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from Municipal Agency - 04/27/20
Owner View project details and contacts
Architect View project details and contacts
Description

Provide design services for river and streambank improvements along the Yampa River within an urbanized area of Steamboat Springs, Colorado. The project area identified for work encompasses a section of the Yampa River and the adjacent Yampa River Core Trail which provide numerous water and land based recreational opportunities for visitors and residents.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents