Similar Projects
Public Health Department HVAC Controls
Alteration
Post-Bid
Saint Charles, MO 63301

Saint Charles High School HVAC Upgrades
Alteration
Post-Bid
Saint Charles, MO 63301

Timberland HS Rooftop Unit
Results
Wentzville, MO 63385

Hickman High Penthouse Chiller Replacement
Infrastructure
Results
Columbia, MO 65203

Multi-Purpose Building 15 Ton HVAC System Replacement
Alteration
Post-Bid
Poplar Bluff, MO

Radiant Heat Installation
Alteration
Results
Raymore, MO

Replacing Two 20 Ton Rooftop Condensing Units and One 15 Ton Package Unit at Kay Porter Theater
Alteration
Post-Bid
Poplar Bluff, MO

Oakland Middle HVAC Replacement
Alteration
Results
Columbia, MO 65202

HVAC Services for the Philips Park Pavilion
Addition
Post-Bid
Columbia, MO 65201

HVAC Repairs, Multiple Assets
Alteration
Results
Jefferson City, MO 65101

HVAC Updates
Alteration
Post-Bid
MO

2022 HVAC Upgrades Project for Rogers Elementary
Alteration
Results
Mehlville, MO 63129

Installation of 3 New HVAC Systems
Alteration
Post-Bid
Willard, MO

2021 Hazelwood Firehouse 2 HVAC Split System Replacement
Alteration
Results
Hazelwood, MO 63042

Projects and Facility Improvements Under a Guaranteed Energy Savings Contract
Alteration
Post-Bid
MO

Last Updated 03/30/2023 07:01 AM
Project Title

Replace HVAC MSHP Troop E HQ Building

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO 63901   (Butler County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,103,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes complete demolition and replacement of existing HVAC units with new roof mounted units, removal of existing multizone ductwork, and replacement with branch and main duct, VAV boxes with electric reheat, and air devices. Additional items includes removal and replacement of all acoustical tile and supporting structural and electrical work. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. SITE NUMBER: 4758 FACILITY NUMBER: 55125

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents