Similar Projects
Swenson Arts And Technology High School Career And Technology Improvements
Renovation, Addition
Conception
Philadelphia, PA 19114

2020 Summer Renovations at Benjamin Franklin High School/Science Leadership Academy - General Construction
Renovation
Bidding
Less than $1,750,000 est. value
Philadelphia, PA 19130

Network Cabling Services
Renovation
Post-Bid
Philadelphia, PA 19124

Bathroom Renovations
Renovation
Post-Bid
Philadelphia, PA 19019

Feltonville Intermediate School Classroom Modernization General Contract
Renovation
Results
$693,947 est. value
Philadelphia, PA 19120

Turnkey Development of New K-8 School
New Construction
Results
Less than $70,000,000 est. value
Philadelphia, PA

Bache-Martin School Classroom Modernization General Contract
Renovation
Construction
Less than $749,740 est. value
Philadelphia, PA 19130

Charles W Henry Classroom Modernization - General
Renovation
Construction
Less than $1,343,825 est. value
Philadelphia, PA 19119

Partial Renovation of 1st and 2nd Floors
Renovation
Post-Bid
Philadelphia, PA 19123

Philadelphia High School For Girls Science Lab Renovation - General
Results
$417,500 est. value
Philadelphia, PA

Andrew Hamilton School Major Renovations - General
Renovation
Construction
Less than $4,129,057 est. value
Philadelphia, PA 19139

Painting Services
Renovation
Post-Bid
Philadelphia, PA 19132

Eleanor C Emlen School Classroom Modernization General Contract
Renovation
Results
Less than $642,500 est. value
Philadelphia, PA 19119

Alliance for Progress Charter School
New Construction - 40,000 SF
Construction
$8,000,000 to $9,000,000 est. value
Philadelphia, PA 19121

Classroom Alterations
Renovation
Post-Bid
Philadelphia, PA 19140

Last Updated 09/13/2019 01:26 PM
Project Title

Christo Rey Philadelphia Catholic High School Building

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19141   (Philadelphia County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced November 2017, Construction Complete as of September 2019
Bids Due View project details and contacts
Estimated Value $37,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Middle/Senior High School, 5 Stories Above Grade, 100,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents