Similar Projects
Library Expansion
Renovation, Addition - 28,000 SF
Conception
Mahomet, IL

College of Veterinarian Medicine Small Animal Clinic Oncology Center Addition
Addition - 20,500 SF
Conception
$10,873,000 est. value
Urbana, IL 61802

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Professional Services for Willard Airport - TSA Checkpoint Relocation
New Construction, Infrastructure - 7,400 SF
Bidding
$1,880,000 est. value
Savoy, IL 61874

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

A-E Architectural Design Services at Various Installations
Post-Bid
Less than $99,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Infrastructure Investment and Jobs Act - Environmental AE MATOC
Renovation, Term Contract
Design
Less than $45,000,000 est. value

Engineering, Planning and Development
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Architect and Engineering (A-E) Environmental Support Services for Comprehensive Long-Term Environmental Action Navy (Clean) In Navfac Atlantic's AOR, Primarily In The Mid-Atlantic Northeast, Southeast
Post-Bid
$20,000 to $400,000,000 est. value

Florida Windspeed UFC Update
Results

Multiple Award Contract (MAC), Indefinite Delivery /Indefinite Quantity (IDIQ), Architect-Engineer (A-E) Traffic Engineering and Transportation Planning Services
Post-Bid
Less than $40,000,000 est. value

Last Updated 04/28/2022 09:39 AM
Project Title

Architectural Services for College of Veterinarian Medicine Small Animal Clinic Oncology Center Addition

Physical Address View project details and contacts
City, State (County) Urbana, IL 61802   (Champaign County)
Category(s) Animal/Plant/Fish Facility, Professional Services
Sub-Category(s) Animal/Plant/Fish Facility, Architectural
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description The Oncology Services mission is to provide the best cancer care that patients and their human caretakers deserve through the compassionate delivery of cutting edge technologies. These technologies include surgery, chemotherapy, radiation therapies and clinical trials to evaluate new and developing technologies. Delivery of these services must be the most advanced, most sophisticated and most effective cancer care offered in the United States. The Veterinary Medicine Small Animal Clinic's cancer care will combine a unique blend of compassion and science that will be delivered in a client and patient-centered environment, which reduces stress in veterinary patients and their human families. Meeting this goal is the purpose for the expanded Oncology Center. The project will design and construct a new Oncology Center as an addition to the Small Animal Clinic at the Veterinary Teaching Hospital along with renovation of existing spaces as required. The project will begin with a Conceptualization Phase to confirm location of the proposed addition and the availability of required utilities followed by the Schematic Design Phase to better define the scope, schedule, cost, and project delivery method. Following the Schematic Design Phase, the project will seek approval and a funding increase from the University of Illinois Board of Trustees. It is also the University's intent to utilize the same PSC for the remainder of the project for design development, construction documents, bidding, construction administration, and warranty phase professional services. A concept study for this project as well as the executed program statement are available at the following ftp site: https://fssecure.fs.illinois.edu/thinclient/Login.aspx username: U21076 password: bWj74670Cr Only those firms which meet the following qualifications will be considered: There is a 30 percent BEP goal for this procurement. See solicitation documentation for details. There is a 3 percent Veteran-owned business goal for this procurement. See solicitation documentation for details. The contract(s) for this solicitation could exceed $50,000 annually. *Project Area (NASF): 14,625 NASF *Construction Budget: $10,873,000

Details

1 Animal/Plant/Fish Facility, 20,500 SF Addition, Building.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents