Similar Projects
I-15; Black Ridge to Iron County Rehabilitation High Volume
Bidding
$10,000,000 to $15,000,000 est. value

Water Meter Replacement Project
Post-Bid
Springdale, UT

Merrill Road Project 2019
Post-Bid
Washington, UT

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

I-15; Exit 16 Interchange Improvements Phase 1
Results
$20,000,000 to $30,000,000 est. value
UT

Sand Hollow Regional Pipeline Alignment Preparation Project
Construction
Saint George, UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the Pioneer Park Loop Road
Results
Less than $175,437 est. value
Saint George, UT 84790

2020 Spring Pavement Maintenance
Post-Bid
Ivins, UT 84738

2019 Slurry Seal Project
Results
Hurricane, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

SR-228; Leeds Main Street
Results
$500,000 to $1,500,000 est. value
UT

Drainage Improvements and Pavement Maintenance Project
Post-Bid
Saint George, UT 84770

I-15; 400 S. Underpass
Results
$1,500,000 to $3,000,000 est. value
UT

Construction of the 2000 South, 2450 South and 3430 East Road Improvements
Results
Saint George, UT

Last Updated 06/13/2019 10:02 AM
Project Title

Construction of the Zion Shadows and Red Hawk Improvements

Physical Address View project details and contacts
City, State (County) Springdale, UT 84767   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project includes approximately 785 ft of 8" PVC Waterline, 100 ft of 12" and 24" RCP storm drain pipe, 40,000 square feet of asphalt reconstruction and 1,500 feet of curb and gutter as well as other improvements. The general scope of work for the two areas included in the project is as follows: Zion Shadows Circle - installing new 8" PVC waterline, disconnecting two waterlines currently in service, reconnecting the meters with new service lateral connections, asphalt reconstruction. Red Hawk Dr. - reconnecting the meters with new service lateral connections, storm drain improvements, over-excavation for clay material removal and import fill, asphalt reconstruction, and curb and gutter.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents