Similar Projects
Heritage Hunt Sewage Pumping Station (SPS) and Force Main (FM) Project
New Construction
Design
Woodbridge, VA

Heritage Hunt Sewage Pumping Station, L52 Replacement, and Force Main Extension
New Construction
Bidding
est. value
Gainesville, VA 20155

Pump Station No. 91 Replacement
New Construction
Bidding
Norfolk, VA 23502

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Rady Park Pump Station Replacement
Results
Warrenton, VA

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Annual Construction Services - Wastewater Pump Stations
Term Contract
Bidding
Chesapeake, VA

Design Build Services of Ivy Creek Interceptor Division 5 and 6 and Route 460 Pump Station
Post-Bid
Roanoke, VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

Pump Station 46 Rehabilitation
Renovation
Bidding
Suffolk, VA

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Last Updated 02/02/2022 12:51 PM
Project Title

Turner Road Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Richmond, VA 23234   (Chesterfield County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all related appurtenances. 1. Demolition of two existing pumps, associated piping, valves, electrical equipment, and other items. 2. Furnish and install four new pumps (430 hp), associated piping, valves, instrumentation and controls, electrical equipment, standby generator (1500 kW), and other items.

Details

Lift and Pump Stations, Renovation, Lift and Pump Stations, 1,102 SF Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 40 - Process Integration.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists, Cranes, Bridge Cranes, Hoists.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 46 - Water and Wastewater Equipment, Grinding and Shredding Equipment, Inline Grinders.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents