Similar Projects
Primate Center Chilled Water Extension - MEP
Infrastructure
Bidding
$2,130,800 est. value
Madison, WI 53774

2021 Sanitary Sewer I/I Reduction Project
Infrastructure
Bidding
Monona, WI

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Road Improvements Chip and Crack Seal
Post-Bid
Windsor, WI 53598

Crack Routing and Sealing
Results
Madison, WI 53703

2021 Road Improvements - Pulverize and Overlay
Post-Bid
DeForest, Middleton, Morrisonville, WI 53562

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

Benton Street Reconstruction
Post-Bid
Rockdale, WI 53523

Last Updated 07/01/2021 07:21 AM
Project Title

Edgerton South Main Street Improvements

Physical Address View project details and contacts
City, State (County) Edgerton, WI   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The South Main Street Improvements Project extends from Lord Street (USH 51) to the City limits (CTH F). Total distance is approximately 3,200 L.F. The project includes new water main, sanitary sewer main and services to the ROW. Removal of the existing concrete pavement and curb and gutter is part of the project as well as temporary paving.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents