Similar Projects
Last Updated | 09/06/2022 03:02 PM |
Project Title | S 8th and N Replace Transformer - City of Lincoln |
Physical Address | View project details and contacts |
City, State (County) | Lincoln, NE 68508 (Lancaster County) |
Category(s) | Heavy and Highway, Industrial/Manufacturing |
Sub-Category(s) | Power Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $142,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace the existing 115/34.5/12kV, 45 MVA transformer (T171) with a new transformer and 12kV switchgear. Transformer size estimated at 36MVA however final size to be determined. Transformer T171 was manufactured in 1978, and will be 44 years old in 2022. LES assumes an average life of 55 years for power transformers in accordance with the Substation Transformer Replacement Study. However, this unit was identified as one of the top 10 transformers to be considered for replacement based on health, system/environment impact, and age in Substation's 2018 assessment. This project is included in the city's 2023-2028 Capital Improvement Plan (CIP). As of September 5, 2022, further details regarding design and construction have not been identified. ____________________________________________________ This project will replace the existing 115/34.5/12kV, 45 MVA transformer (T171) with a new transformer and 12kV switchgear. Transformer size estimated at 36MVA however final size to be determined. Transformer T171 was manufactured in 1978, and will be 44 years old in 2022. LES assumes an average life of 55 years for power transformers in accordance with the Substation Transformer Replacement Study. However, this unit was identified as one of the top 10 transformers to be considered for replacement based on health, system/environment impact, and age in Substation's 2018 assessment. This project is included in the city's 2021-2027 Capital Improvement Plan (CIP). As of January 3, 2021, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |